Solaria Solar and Roofing
Forbes-recognized family-owned solar and roofing company serving St. Petersburg and Central Florida
8+
Years in Business
25
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About Solaria Solar and Roofing
Solaria Solar and Roofing is a family-owned solar and roofing installation company serving St. Petersburg and the broader Central Florida region. The company was recognized by Forbes as one of the best solar companies in 2023 and 2024, reflecting their commitment to quality installations and customer service.
Solaria provides residential and commercial solar panel installations alongside comprehensive roofing services. The company’s combined solar and roofing expertise allows homeowners to coordinate roof replacement with solar installation for optimal system integration and cost savings.
The company maintains BBB accreditation and serves St. Petersburg, Tampa, Clearwater, Orlando, and surrounding communities across Central Florida. Solaria handles the complete installation process including system design, permitting, installation, and utility interconnection.
Service Area
Solaria Solar and Roofing serves the following areas within a 62-mile radius:
Contact Information
Are you Solaria Solar and Roofing?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
25 reviews
Robert S.
Solaria handled both our roof replacement and solar installation in St. Petersburg. Having one company manage both saved us time and ensured perfect integration.
Nancy K.
Forbes-recognized for a reason. The installation quality was excellent and the team was professional throughout. Our system is producing above projections.
Timothy D.
Good family-owned company with quality workmanship. They handled the Duke Energy interconnection and all permits. System has been reliable since day one.
Frequently Asked Questions About Solaria Solar and Roofing
What services does Solaria Solar and Roofing offer?
Solaria Solar and Roofing offers Solar Installation, Solar Design, Grid Connection.
Is Solaria Solar and Roofing NABCEP certified?
Solaria Solar and Roofing holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.
What areas does Solaria Solar and Roofing serve?
Solaria Solar and Roofing serves St. Petersburg, Tampa, Clearwater, Orlando, Largo, Bradenton. They are based in St. Petersburg with a service radius of 100 km.
What warranty does Solaria Solar and Roofing offer?
Solaria Solar and Roofing offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Solaria Solar and Roofing's customer reviews?
Solaria Solar and Roofing has a 4.8/5 rating based on 25 customer reviews. Customers consistently rate them highly.
How long has Solaria Solar and Roofing been in business?
Solaria Solar and Roofing was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.
Similar Installers in St. Petersburg
Get a Free Solar Quote from Solaria Solar and Roofing
Fill in your details and we'll connect you with Solaria Solar and Roofing.
Quote request sent!
Solaria Solar and Roofing will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile