Solaris Renewables
Locally owned Massachusetts solar installer specializing in custom residential solar systems since 2017
9+
Years in Business
33
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About Solaris Renewables
Solaris Renewables is a locally owned solar installation company based at 3 Electronics Avenue, Suite 102 in Danvers, MA. Founded in 2017, the company specializes in designing and installing custom residential solar panel systems across Massachusetts, including Worcester and surrounding communities.
The company is approved by the Massachusetts Clean Energy Center and has earned strong customer reviews, with a 4.8-star average rating. Solaris Renewables installs Enphase microinverter systems and offers battery storage options for energy backup. The company has documented installations in Worcester, with customers praising their attention to detail and site-specific system design.
Solaris Renewables provides end-to-end residential solar service from consultation and roof assessment through system design, permitting, installation, and utility interconnection. The company assists customers with Massachusetts SMART program enrollment and net metering setup.
Service Area
Solaris Renewables serves the following areas within a 62-mile radius:
Contact Information
Are you Solaris Renewables?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Inverters
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
33 reviews
Peter S.
Solaris Renewables installed our system in Worcester and it was a great experience. The team was thorough in their site assessment and designed a system that works perfectly for our home.
Catherine L.
From the initial consultation to the final inspection, Solaris was professional and transparent. Our panels have been producing consistently above estimates.
Andrew H.
Good local company that takes pride in their work. The installation was clean and well done. They helped us through the SMART program application process.
Frequently Asked Questions About Solaris Renewables
What services does Solaris Renewables offer?
Solaris Renewables offers Solar Installation, Battery Storage, Solar Design, Monitoring.
Is Solaris Renewables NABCEP certified?
Solaris Renewables holds the following certifications: MassCEC Approved. Contact them directly for the latest accreditation details.
What areas does Solaris Renewables serve?
Solaris Renewables serves Worcester, Danvers, Salem, Beverly, Peabody, Gloucester. They are based in Worcester with a service radius of 100 km.
What warranty does Solaris Renewables offer?
Solaris Renewables offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Solaris Renewables's customer reviews?
Solaris Renewables has a 4.8/5 rating based on 33 customer reviews. Customers consistently rate them highly.
How long has Solaris Renewables been in business?
Solaris Renewables was founded in 2017 and has been in business for 9 years. They have solid experience in the solar industry.
Similar Installers in Worcester
Get a Free Solar Quote from Solaris Renewables
Fill in your details and we'll connect you with Solaris Renewables.
Quote request sent!
Solaris Renewables will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile