S

SolarPowerful

Hampshire solar specialists since 2010 with hundreds of installations, NICEIC approved and RECC member

Portsmouth, UK
4.6 (18 reviews)
Verified
Residential Commercial Industrial

16+

Years in Business

18

Customer Reviews

80 km

Service Area

2-10

Employees

SurgePV Score

8.2 / 10
Customer Reviews
92%
Certifications
100%
Experience
100%
Services Range
90%
Warranty Coverage
0%
Online Presence
50%

About SolarPowerful

SolarPowerful is a Hampshire-based solar panel installation company located at Unit 7, Enterprise Industrial Estate, Horndean, Waterlooville, PO8 0BB. Established since 2010, the company has built an enviable reputation in Hampshire and beyond for quality of workmanship and customer service, having successfully installed hundreds of solar PV systems across the UK for domestic, commercial, and industrial clients.

The company offers a complete solar PV service from design to installation, including energy storage solutions, EV charging points, and electrical contracting. SolarPowerful holds MCS, NICEIC, RECC, and NAPIT accreditations and is a member of the Renewable Energy Consumer Code and Electric Vehicle Consumer Code, providing customers with additional consumer protection.

SolarPowerful has earned positive reviews with customers praising their back-up support, technical knowledge, and willingness to provide honest advice. The company provides free site surveys, detailed system designs with projected energy generation figures, and comprehensive aftercare including system monitoring support and maintenance services.

Service Area

SolarPowerful serves the following areas within a 80 km radius:

PortsmouthHampshireWaterloovilleHavantChichesterSouthampton

Are you SolarPowerful?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance
Monitoring

Certifications & Accreditations

MCS NICEIC RECC NAPIT

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4.6

18 reviews

Verified Customer

5 October 2025
Verified Customer

I can highly recommend SolarPowerful. They installed a number of Solar PV and storage systems locally and already came highly recommended. Their system recommendation was perfect for us.

Verified Customer

22 July 2025
Verified Customer

Professional and knowledgeable team from survey through to installation. The system was designed to suit our specific needs and is performing well.

Verified Customer

10 May 2025
Verified Customer

Good service overall. The installation team were efficient and tidy, and the follow-up support has been responsive.

Frequently Asked Questions About SolarPowerful

What services does SolarPowerful offer?

SolarPowerful offers Solar Installation, Battery Storage, EV Charging, Maintenance, Monitoring.

Is SolarPowerful MCS certified?

Yes, SolarPowerful is MCS certified and also holds NICEIC, RECC, NAPIT certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does SolarPowerful serve?

SolarPowerful serves Portsmouth, Hampshire, Waterlooville, Havant, Chichester, Southampton. They are based in Portsmouth with a service radius of 80 km.

What warranty does SolarPowerful offer?

Contact SolarPowerful directly for their current warranty terms.

How are SolarPowerful's customer reviews?

SolarPowerful has a 4.6/5 rating based on 18 customer reviews. Customers consistently rate them highly.

How long has SolarPowerful been in business?

SolarPowerful was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from SolarPowerful

Fill in your details and we'll connect you with SolarPowerful.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote