S

Solarsmith

MCS-certified solar installations across South London and Surrey

London, UK
0 (0 reviews)
Verified
Residential Commercial

17+

Years in Business

0

40 km

Service Area

1-10

Employees

SurgePV Score

5.8 / 10
Customer Reviews
0%
Certifications
75%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
50%

About Solarsmith

Solarsmith is a South London solar installation company trading as Electrosmith Ltd, based in Reigate and serving a wide corridor across South London and Surrey. Founded in 2009, the company holds MCS and NAPIT certifications, covering residential and commercial solar PV installations, battery storage, and ongoing maintenance.

The company’s service area includes Sutton, Croydon, Wimbledon, Clapham, Battersea, Wandsworth, Tooting, Balham, Streatham, Mitcham, Reigate, and Redhill. This positions Solarsmith as a practical choice for homeowners and businesses in the southern boroughs of London who want a locally based installer rather than a national provider.

Solarsmith handles projects from initial survey through to grid connection, with post-installation maintenance available to keep systems running efficiently. Their NAPIT registration confirms competence for electrical installation work associated with solar PV systems.

Service Area

Solarsmith serves the following areas within a 40 km radius:

LondonSuttonCroydonWimbledonClaphamBatterseaWandsworthReigateRedhill

Are you Solarsmith?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

MCS NAPIT

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Solarsmith

What services does Solarsmith offer?

Solarsmith offers Solar Installation, Battery Storage, Maintenance.

Is Solarsmith MCS certified?

Yes, Solarsmith is MCS certified and also holds NAPIT certification. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Solarsmith serve?

Solarsmith serves London, Sutton, Croydon, Wimbledon, Clapham, Battersea, Wandsworth, Reigate and 1 other areas. They are based in London with a service radius of 40 km.

What warranty does Solarsmith offer?

Solarsmith offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Solarsmith's customer reviews?

Solarsmith does not have any reviews yet. Be the first to leave a review after using their services.

How long has Solarsmith been in business?

Solarsmith was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Solarsmith

Fill in your details and we'll connect you with Solarsmith.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote