Solent Renewables
MCS certified Hampshire solar installer combining 17 years of electrical experience with a decade of solar expertise
4+
Years in Business
15
Customer Reviews
60 km
Service Area
2-10
Employees
SurgePV Score
About Solent Renewables
Solent Renewables is a Hampshire-based solar installation company located at 63 Shanklin Road, Shirley, Southampton, SO15 7RG. The company serves Portsmouth, Southampton, Winchester, and the wider Hampshire area, combining 17 years of electrical experience with over a decade of solar expertise.
The company specialises in solar PV installations and battery storage systems for residential and commercial properties. Solent Renewables is fully certified by MCS and NAPIT, and is a Checkatrade-approved installer. Every installation meets the highest standards of safety, quality, and customer care. The team handles the complete process from initial site assessment and system design through to installation and commissioning.
Solent Renewables has completed installations across the south coast, with customers praising their local knowledge, technical expertise, and honest advice. The company provides free no-obligation quotes, detailed energy generation estimates, and post-installation monitoring support to help customers get the most from their solar investment.
Service Area
Solent Renewables serves the following areas within a 60 km radius:
Contact Information
Are you Solent Renewables?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.5
15 reviews
Verified Customer
Very professional and thorough. The team explained everything clearly and the installation was completed on time with minimal disruption.
Verified Customer
Excellent local service. They designed a system that fits our roof perfectly and the generation figures have been impressive since day one.
Verified Customer
Good quality installation and helpful team. The aftercare support has been responsive when I had questions about the monitoring app.
Frequently Asked Questions About Solent Renewables
What services does Solent Renewables offer?
Solent Renewables offers Solar Installation, Battery Storage, EV Charging, Maintenance.
Is Solent Renewables MCS certified?
Yes, Solent Renewables is MCS certified and also holds NAPIT, Checkatrade certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Solent Renewables serve?
Solent Renewables serves Portsmouth, Southampton, Winchester, Hampshire, Fareham, Gosport. They are based in Portsmouth with a service radius of 60 km.
What warranty does Solent Renewables offer?
Contact Solent Renewables directly for their current warranty terms.
How are Solent Renewables's customer reviews?
Solent Renewables has a 4.5/5 rating based on 15 customer reviews. Customers consistently rate them highly.
How long has Solent Renewables been in business?
Solent Renewables was founded in 2022 and has been in business for 4 years. They are a newer entrant in the solar installation market.
Similar Installers in Portsmouth
Get a Free Solar Quote from Solent Renewables
Fill in your details and we'll connect you with Solent Renewables.
Quote request sent!
Solent Renewables will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile