South Lincs Solar
5-star rated solar PV and battery storage specialists with 15+ years in the electrical industry serving Lincolnshire
2026+
Years in Business
101
Customer Reviews
80 km
Service Area
2-10
Employees
SurgePV Score
About South Lincs Solar
South Lincs Solar is a small, independent solar PV company based at 86 Six House Bank, Northgate, Spalding PE11 3QG. The company can be contacted on 01775 640146. South Lincs Solar serves the domestic and commercial sector across South Lincolnshire, including Spalding, Lincoln, Grantham, Boston, Stamford, and Peterborough.
The team brings over 15 years of experience in the electrical industry to every installation, with a focus on quality of workmanship and customer service rather than high installation volumes. Services include solar panel installation, battery storage, and EV charging.
South Lincs Solar holds a 5-star rating from 101 reviews, one of the highest review volumes among independent Lincoln and Lincolnshire solar installers. Customers consistently praise the team’s knowledge, detailed explanations of equipment options, and attentive service throughout each project stage. The company manages all associated paperwork including MCS certification and Smart Export Guarantee registration. South Lincs Solar can also be found on its Facebook page and at southlincssolar.co.uk.
Service Area
South Lincs Solar serves the following areas within a 80 km radius:
Contact Information
Are you South Lincs Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
5
101 reviews
Verified Customer
Knowledgeable staff who provided detailed explanations of all equipment options. Exceptional customer service at every stage of the process.
Verified Customer
Efficient installation process from start to finish. The team were professional and tidy. We are delighted with our solar system.
Frequently Asked Questions About South Lincs Solar
What services does South Lincs Solar offer?
South Lincs Solar offers Solar Installation, Battery Storage, EV Charging.
Is South Lincs Solar MCS certified?
Yes, South Lincs Solar is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does South Lincs Solar serve?
South Lincs Solar serves Spalding, Lincoln, Grantham, Boston, Stamford, Peterborough. They are based in Lincoln with a service radius of 80 km.
What warranty does South Lincs Solar offer?
South Lincs Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are South Lincs Solar's customer reviews?
South Lincs Solar has a 5/5 rating based on 101 customer reviews. Customers consistently rate them highly.
How long has South Lincs Solar been in business?
South Lincs Solar was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Lincoln
Get a Free Solar Quote from South Lincs Solar
Fill in your details and we'll connect you with South Lincs Solar.
Quote request sent!
South Lincs Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile