SE

Southern Exposure Solar

Locally owned Richmond solar installer with NABCEP-certified team, employee-only crews, and CertainTeed 25-year warranty

Richmond, Virginia
4.7 (33 reviews)
Verified
Residential

7+

Years in Business

0

33

Customer Reviews

75 mi

Service Area

2-10

Employees

SurgePV Score

8.7 / 10
Customer Reviews
94%
Certifications
90%
Experience
70%
Services Range
90%
Warranty Coverage
100%
Online Presence
75%

About Southern Exposure Solar

Southern Exposure Solar is a locally founded and operated solar installation company based in Ashland, Virginia, serving the greater Richmond metro area. Established in 2019, the company has built a reputation for quality workmanship and a no-subcontractor policy, meaning every installer who works on a project is a direct employee of the company. Southern Exposure holds NABCEP certification and is a CertainTeed Master Solar Installer, which qualifies their installations for CertainTeed’s Gold Solstice warranty covering panels, roof penetrations, and workmanship for 25 years.

The company specializes in residential solar photovoltaic systems and handles every step of the process in-house, from initial consultation and system design through permitting, installation, and post-installation support. Southern Exposure installs CertainTeed panels with Enphase microinverters and offers financing assistance to help homeowners manage upfront costs.

Southern Exposure Solar maintains a 4.7-star average rating across review platforms, with customers consistently praising the consultative sales approach, transparent pricing, and attention to detail during installation. The company is BBB-accredited and has earned recognition as one of the top-rated local solar installers in the Richmond area.

Service Area

Southern Exposure Solar serves the following areas within a 75-mile radius:

RichmondAshlandGlen AllenMechanicsvilleHenricoChesterfieldMidlothian

Are you Southern Exposure Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Solar Design
Maintenance
financing_assistance
Roof Assessment

Certifications & Accreditations

NABCEP CertainTeed Master Solar Installer BBB Accredited

Partner Manufacturers

Panels

CertainTeed

Inverters

Enphase

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

25 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

33 reviews

James H.

15 October 2025
Verified Customer

Southern Exposure made the entire process simple. Their team handled everything from design to permitting to installation without subcontractors. Our system has been performing above the projected output since day one.

Rebecca M.

22 July 2025
Verified Customer

No pressure sales approach and transparent pricing. The crew was professional and respectful of our property. System was up and running within six weeks of signing the contract.

Tom W.

10 May 2025
Verified Customer

The CertainTeed warranty gave us peace of mind. Installation was clean and the team walked us through the monitoring app before they left. Electric bill dropped significantly in the first month.

Frequently Asked Questions About Southern Exposure Solar

What services does Southern Exposure Solar offer?

Southern Exposure Solar offers Solar Installation, Solar Design, Maintenance, financing_assistance, Roof Assessment.

Is Southern Exposure Solar NABCEP certified?

Yes, Southern Exposure Solar is NABCEP certified and also holds CertainTeed Master Solar Installer, BBB Accredited certifications. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Southern Exposure Solar serve?

Southern Exposure Solar serves Richmond, Ashland, Glen Allen, Mechanicsville, Henrico, Chesterfield, Midlothian. They are based in Richmond with a service radius of 120 km.

What warranty does Southern Exposure Solar offer?

Southern Exposure Solar offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.

How are Southern Exposure Solar's customer reviews?

Southern Exposure Solar has a 4.7/5 rating based on 33 customer reviews. Customers consistently rate them highly.

How long has Southern Exposure Solar been in business?

Southern Exposure Solar was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Southern Exposure Solar

Fill in your details and we'll connect you with Southern Exposure Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote