Spectrum Solar Power
BBB-accredited Orlando solar company providing customized residential and commercial solar systems
6+
Years in Business
30
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About Spectrum Solar Power
Spectrum Solar Power is a solar installation company headquartered at 121 South Orange Avenue, Suite 1500 in downtown Orlando, Florida. The company has grown from a small Orlando-based team into one of the region’s recognized solar providers, offering customized solar panel and battery storage systems for residential and commercial properties.
Spectrum Solar Power holds an A+ BBB rating and has been BBB-accredited since June 2024. The company maintains a 4.9-star rating across review platforms, with customers highlighting quick response times and thorough project execution. Spectrum handles the full installation process including system design, engineering, permitting, and utility interconnection.
The company serves homeowners and businesses throughout Central Florida, designing systems based on individual energy consumption patterns and property characteristics. Spectrum Solar Power also assists clients with available financing options to reduce upfront costs.
Service Area
Spectrum Solar Power serves the following areas within a 50-mile radius:
Contact Information
Are you Spectrum Solar Power?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
30 reviews
Verified Customer
Spectrum Solar Power delivered on every promise. The installation was quick, clean, and the system is generating more than projected.
Verified Customer
From design to installation, the team at Spectrum was professional and responsive. They made going solar a smooth process.
Verified Customer
Great value and excellent customer service. They handled all the permitting and inspections without any issues.
Frequently Asked Questions About Spectrum Solar Power
What services does Spectrum Solar Power offer?
Spectrum Solar Power offers Solar Installation, Battery Storage, system_design.
Is Spectrum Solar Power NABCEP certified?
Spectrum Solar Power holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does Spectrum Solar Power serve?
Spectrum Solar Power serves Orlando, Winter Park, Kissimmee, Sanford, Clermont. They are based in Orlando with a service radius of 80 km.
What warranty does Spectrum Solar Power offer?
Spectrum Solar Power offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Spectrum Solar Power's customer reviews?
Spectrum Solar Power has a 4.9/5 rating based on 30 customer reviews. Customers consistently rate them highly.
How long has Spectrum Solar Power been in business?
Spectrum Solar Power was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.
Similar Installers in Orlando
Get a Free Solar Quote from Spectrum Solar Power
Fill in your details and we'll connect you with Spectrum Solar Power.
Quote request sent!
Spectrum Solar Power will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile