SS

Spring Solar

Family-owned solar installer serving Salt Lake City and Utah County with personalized residential and commercial solutions

Salt Lake City, Utah
4.8 (462 reviews)
Verified
Residential Commercial

10+

Years in Business

0

462

Customer Reviews

62 mi

Service Area

2-10

Employees

SurgePV Score

8 / 10
Customer Reviews
96%
Certifications
60%
Experience
85%
Services Range
90%
Warranty Coverage
80%
Online Presence
50%

About Spring Solar

Spring Solar is a family-owned and operated solar installation company founded in 2016 and based at 1442 Copper John Way in Bluffdale, Utah. The company serves residential and commercial property owners across the Salt Lake City metropolitan area, including apartment complexes, condominiums, and single-family and multifamily residences.

The company handles every aspect of the solar installation process from initial consultation through design, permitting, installation, and utility interconnection. Spring Solar is BBB accredited and has built a strong reputation through word-of-mouth referrals and consistently high customer ratings. The team is available Monday through Saturday and typically responds to inquiries within a few hours.

With a 4.8-star average rating from over 460 customer reviews, Spring Solar is one of the highest-rated solar installers in the Salt Lake City area. Customers consistently praise the company’s personalized service, transparent pricing, and efficient installation timelines. Spring Solar offers 25-year manufacturer warranties on panels and inverters plus a 10-year workmanship guarantee.

Service Area

Spring Solar serves the following areas within a 62-mile radius:

Salt Lake CityBluffdaleWest JordanMidvaleSouth JordanRivertonDraperHerrimanLehiPark City

Are you Spring Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Maintenance

Certifications & Accreditations

BBB Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

462 reviews

Rachel W.

20 October 2025
Verified Customer

Spring Solar was incredible from start to finish. Being family-owned, they treated us like neighbors. The installation crew was efficient, clean, and professional. Our energy bills have dropped dramatically.

Jeff M.

14 July 2025
Verified Customer

Best experience I could have asked for. They responded to my inquiry within hours and had a detailed proposal ready within a day. The install was completed on time and the system is producing exactly as promised.

Sarah C.

2 April 2025
Verified Customer

Chose Spring Solar based on Google reviews and they did not disappoint. Very transparent about costs and timeline. The crew finished our roof install in one day and everything was left spotless.

Frequently Asked Questions About Spring Solar

What services does Spring Solar offer?

Spring Solar offers Solar Installation, Battery Storage, Solar Design, Maintenance.

Is Spring Solar NABCEP certified?

Spring Solar holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Spring Solar serve?

Spring Solar serves Salt Lake City, Bluffdale, West Jordan, Midvale, South Jordan, Riverton, Draper, Herriman and 2 other areas. They are based in Salt Lake City with a service radius of 100 km.

What warranty does Spring Solar offer?

Spring Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Spring Solar's customer reviews?

Spring Solar has a 4.8/5 rating based on 462 customer reviews. Customers consistently rate them highly.

How long has Spring Solar been in business?

Spring Solar was founded in 2016 and has been in business for 10 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Spring Solar

Fill in your details and we'll connect you with Spring Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote