Steel City Solar
Locally owned Southern Colorado solar installer serving residential and commercial customers since 2008
18+
Years in Business
25
Customer Reviews
62 mi
Service Area
1-10
Employees
SurgePV Score
About Steel City Solar
Steel City Solar LLC is a locally owned and operated solar installation company based at 49 N Silicon Drive in Pueblo West, Colorado, serving the Colorado Springs metro area and Southern Colorado. Founded in 2008, the company provides residential and commercial solar panel installations throughout Pueblo County, El Paso County, and Fremont County. Steel City Solar’s business hours are Monday through Friday from 8:00 AM to 5:00 PM.
The company designs and installs solar systems tailored to Southern Colorado’s climate and solar conditions. Steel City Solar handles the full project from initial consultation and system design through permitting, installation, and utility interconnection. The company’s long history in the region means deep familiarity with local building departments, utility requirements, and the solar production potential at various elevations across Southern Colorado.
Steel City Solar is listed on the EnergySage marketplace and participates in the Colorado C-PACE program for commercial solar financing. The company holds a 4.3-star rating on EnergySage and maintains accreditation with the Pueblo West Chamber of Commerce. For homeowners and business owners in the Colorado Springs and Pueblo areas looking for a locally rooted installer with nearly two decades of Southern Colorado experience, Steel City Solar offers straightforward service and regional expertise.
Service Area
Steel City Solar serves the following areas within a 62-mile radius:
Contact Information
Are you Steel City Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.3
25 reviews
Greg S.
Steel City Solar installed our residential system and the results have been great. Being a local company, they understood the specific building codes and utility requirements in our area. Fair pricing and good work.
Lisa M.
We chose Steel City because they have been around since 2008 and know Southern Colorado well. The installation was straightforward and the system is producing as promised. Good communication throughout.
Robert E.
Decent local company. The crew did clean work and the system has been trouble-free. They were honest about what to expect in terms of production at our location and the numbers have matched up.
Frequently Asked Questions About Steel City Solar
What services does Steel City Solar offer?
Steel City Solar offers Solar Installation, Solar Design, Maintenance.
Is Steel City Solar NABCEP certified?
Steel City Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does Steel City Solar serve?
Steel City Solar serves Colorado Springs, Pueblo, Pueblo West, Canon City, Florence, Fountain, Penrose. They are based in Colorado Springs with a service radius of 100 km.
What warranty does Steel City Solar offer?
Steel City Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Steel City Solar's customer reviews?
Steel City Solar has a 4.3/5 rating based on 25 customer reviews. They are well-regarded by their customers.
How long has Steel City Solar been in business?
Steel City Solar was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.
Similar Installers in Colorado Springs
Get a Free Solar Quote from Steel City Solar
Fill in your details and we'll connect you with Steel City Solar.
Quote request sent!
Steel City Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile