SS

Strawberry Solar

Michigan's leading solar installer since 2010 with Tesla Powerwall and REC certifications serving the entire lower peninsula

Grand Rapids, Michigan
4.4 (68 reviews)
Verified
Residential

16+

Years in Business

68

Customer Reviews

155 mi

Service Area

11-50

Employees

SurgePV Score

9.1 / 10
Customer Reviews
88%
Certifications
100%
Experience
100%
Services Range
90%
Warranty Coverage
80%
Online Presence
75%

About Strawberry Solar

Strawberry Solar is a turnkey residential solar installation company founded in 2010, headquartered at 4444 2nd Avenue in Detroit, Michigan. The company operates out of the Green Garage with a warehouse at the Russell Industrial Center and serves the entire lower peninsula of Michigan, including Grand Rapids, Ann Arbor, Lansing, and Traverse City.

The company holds multiple manufacturer certifications including Tesla Powerwall Certified Installer, REC Certified Solar Professional, Enphase Ensemble Certified, and Certified LG Chem RESU Installer. Strawberry Solar installs panels from Panasonic and REC paired with Enphase microinverters and battery storage from Tesla Powerwall and LG Chem. The company maintains an A+ rating with the Better Business Bureau.

With over 15 years of experience installing solar in Michigan, Strawberry Solar holds a 4.4-star rating from 68 reviews on Google. The company has earned a reputation as one of the top-rated solar installers on the EnergySage Marketplace for the Grand Rapids and Detroit markets. Strawberry Solar can be reached at (313) 960-7900 or (248) 835-9900.

Service Area

Strawberry Solar serves the following areas within a 155-mile radius:

Grand RapidsDetroitAnn ArborLansingKalamazooTraverse City

Are you Strawberry Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Monitoring

Certifications & Accreditations

Tesla Powerwall Certified REC Certified Solar Professional Enphase Ensemble Certified BBB A+ Rating

Partner Manufacturers

Panels

PanasonicREC

Inverters

Enphase

Batteries

Tesla PowerwallLG Chem RESU

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.4

68 reviews

Amanda K.

15 August 2025
Verified Customer

Strawberry Solar was recommended by a friend and they did not disappoint. The Grand Rapids installation was seamless and the crew was courteous and professional. Our energy bills have dropped significantly.

Scott R.

8 May 2025
Verified Customer

Good experience overall. The Tesla Powerwall integration works perfectly and the system was designed well for our home. Communication could have been slightly better during the permitting phase.

Lisa J.

10 February 2025
Verified Customer

We love our Strawberry Solar system. The team was knowledgeable and helped us understand every aspect of the installation. Fifteen years of experience really shows in their work quality.

Frequently Asked Questions About Strawberry Solar

What services does Strawberry Solar offer?

Strawberry Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Monitoring.

Is Strawberry Solar NABCEP certified?

Strawberry Solar holds the following certifications: Tesla Powerwall Certified, REC Certified Solar Professional, Enphase Ensemble Certified, BBB A+ Rating. Contact them directly for the latest accreditation details.

What areas does Strawberry Solar serve?

Strawberry Solar serves Grand Rapids, Detroit, Ann Arbor, Lansing, Kalamazoo, Traverse City. They are based in Grand Rapids with a service radius of 250 km.

What warranty does Strawberry Solar offer?

Strawberry Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Strawberry Solar's customer reviews?

Strawberry Solar has a 4.4/5 rating based on 68 customer reviews. They are well-regarded by their customers.

How long has Strawberry Solar been in business?

Strawberry Solar was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Strawberry Solar

Fill in your details and we'll connect you with Strawberry Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote