Summit Energy
Expert solar panel installation for homes and businesses across Massachusetts, New Hampshire, and New England
10+
Years in Business
30
Customer Reviews
75 mi
Service Area
11-50
Employees
SurgePV Score
About Summit Energy
Summit Energy is a solar installation company headquartered at 15 Berkshire Road in Mansfield, MA. The company performs residential and commercial solar installations across Massachusetts, including Worcester, as well as New Hampshire, Maine, Vermont, Rhode Island, and Connecticut.
Summit Energy provides full-service solar solutions from initial consultation and system design through permitting, installation, and utility interconnection. The company helps Worcester-area homeowners and businesses take advantage of Massachusetts solar incentives and net metering programs.
Summit Energy operates Monday through Friday from 9 AM to 5:30 PM and offers free solar assessments for prospective customers. The company installs Enphase microinverter systems and provides battery storage options for energy backup and self-consumption optimization.
Service Area
Summit Energy serves the following areas within a 75-mile radius:
Contact Information
Are you Summit Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Inverters
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.6
30 reviews
Brian T.
Summit Energy installed our system in Worcester quickly and professionally. Their online monitoring portal makes it easy to track production. Very happy with the results.
Michelle S.
Good communication and fair pricing. The installation team was on time and completed the job in two days. Our electricity bill has dropped substantially since going solar.
Daniel F.
Summit handled all the permits and utility paperwork for our Worcester installation. The whole process was smooth and the system is outperforming the initial estimates.
Frequently Asked Questions About Summit Energy
What services does Summit Energy offer?
Summit Energy offers Solar Installation, Battery Storage, Solar Design, Grid Connection.
Is Summit Energy NABCEP certified?
Summit Energy holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does Summit Energy serve?
Summit Energy serves Worcester, Mansfield, Boston, Providence, Cambridge, Brockton. They are based in Worcester with a service radius of 120 km.
What warranty does Summit Energy offer?
Summit Energy offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Summit Energy's customer reviews?
Summit Energy has a 4.6/5 rating based on 30 customer reviews. Customers consistently rate them highly.
How long has Summit Energy been in business?
Summit Energy was founded in 2016 and has been in business for 10 years. They are one of the more experienced solar installers in their area.
Similar Installers in Worcester
Get a Free Solar Quote from Summit Energy
Fill in your details and we'll connect you with Summit Energy.
Quote request sent!
Summit Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile