SS

Sunergy Solutions

Solar energy and roofing company serving New England with residential and commercial installations across seven states

Worcester, Massachusetts
4.5 (20 reviews)
Residential Commercial

11+

Years in Business

0

20

Customer Reviews

75 mi

Service Area

11-50

Employees

SurgePV Score

6.7 / 10
Customer Reviews
90%
Certifications
0%
Experience
85%
Services Range
90%
Warranty Coverage
63%
Online Presence
75%

About Sunergy Solutions

Sunergy Solutions LLC is a solar energy and roofing company headquartered at 100 Main Street in Amesbury, MA. The company serves customers across seven states including Massachusetts, Connecticut, Rhode Island, Maine, New Hampshire, Vermont, and Virginia, with a dedicated Worcester service area page and active installations throughout Worcester County.

Sunergy Solutions provides both residential and commercial solar installations alongside roofing and gutter services. This combined capability allows the company to assess roof condition before solar installation and offer integrated roof replacement and solar projects when needed.

The company handles the full solar project lifecycle from initial energy assessment through system design, permitting, installation, and utility interconnection. Sunergy Solutions assists Massachusetts customers with SMART program enrollment, net metering, and available tax incentives.

Service Area

Sunergy Solutions serves the following areas within a 75-mile radius:

WorcesterAmesburyBostonSpringfieldHartfordProvidence

Are you Sunergy Solutions?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Maintenance

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

20 reviews

Ryan O.

30 July 2025
Verified Customer

Sunergy Solutions handled our Worcester solar installation professionally. They also inspected our roof and confirmed it was in good condition before installing. Great bundled approach.

Maria C.

12 April 2025
Verified Customer

Good pricing and professional installation. The team was knowledgeable about Massachusetts solar programs and helped us maximize our savings.

Eric J.

25 January 2025
Verified Customer

Sunergy installed a system on our commercial property in Worcester County. The process was smooth and production numbers have been solid.

Frequently Asked Questions About Sunergy Solutions

What services does Sunergy Solutions offer?

Sunergy Solutions offers Solar Installation, Battery Storage, Solar Design, Maintenance.

Is Sunergy Solutions NABCEP certified?

Sunergy Solutions holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Sunergy Solutions serve?

Sunergy Solutions serves Worcester, Amesbury, Boston, Springfield, Hartford, Providence. They are based in Worcester with a service radius of 120 km.

What warranty does Sunergy Solutions offer?

Sunergy Solutions offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Sunergy Solutions's customer reviews?

Sunergy Solutions has a 4.5/5 rating based on 20 customer reviews. Customers consistently rate them highly.

How long has Sunergy Solutions been in business?

Sunergy Solutions was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Sunergy Solutions

Fill in your details and we'll connect you with Sunergy Solutions.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote