Sunfinity Power
Rhode Island solar and roofing company offering comprehensive energy solutions from their Johnston headquarters
6+
Years in Business
500+
Projects Completed
55
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About Sunfinity Power
Sunfinity Power is a solar and roofing company headquartered at 1665 Hartford Avenue in Johnston, Rhode Island, serving homeowners and businesses across Rhode Island, Massachusetts, and Connecticut. The company offers a unique advantage by combining solar installation with professional roofing services, allowing customers to bundle both projects for a streamlined experience. Sunfinity Power is BBB accredited and has built a growing reputation in the Providence metropolitan area.
The company installs panels from Qcells and REC alongside Enphase and SolarEdge inverter systems, and provides battery storage through Tesla Powerwall and Enphase IQ Battery. Their installation teams handle the full project scope, from initial consultation and system design through permitting, installation, and utility interconnection. For customers needing a new roof, Sunfinity can coordinate the roofing and solar work to minimize disruption.
Sunfinity Power helps homeowners understand Rhode Island’s solar incentive landscape, including the Renewable Energy Growth Program and net metering policies. The company offers free consultations and works with several financing options. Their Johnston office is open Monday through Saturday, and they are available by phone and email for customer inquiries and ongoing support.
Service Area
Sunfinity Power serves the following areas within a 50-mile radius:
Contact Information
Are you Sunfinity Power?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
55 reviews
Nicole W.
Sunfinity Power handled both our roof replacement and solar installation in one project. It saved us time and money, and the finished result looks great. Our system is producing as promised.
Anthony P.
Very professional company. They were upfront about costs and timeline, and the installation crew was efficient and clean. Our electric bill has dropped significantly since going solar.
Karen J.
Good experience overall. Sunfinity offered competitive pricing and the installation quality is solid. Communication was good throughout the process. Would recommend to neighbors.
Frequently Asked Questions About Sunfinity Power
What services does Sunfinity Power offer?
Sunfinity Power offers Solar Installation, Battery Storage, roofing, Solar Design, Energy Audit, Grid Connection.
Is Sunfinity Power NABCEP certified?
Sunfinity Power holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.
What areas does Sunfinity Power serve?
Sunfinity Power serves Providence, Johnston, Cranston, Warwick, Pawtucket, East Providence, North Providence, Woonsocket. They are based in Providence with a service radius of 80 km.
What warranty does Sunfinity Power offer?
Sunfinity Power offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Sunfinity Power's customer reviews?
Sunfinity Power has a 4.7/5 rating based on 55 customer reviews. Customers consistently rate them highly.
How long has Sunfinity Power been in business?
Sunfinity Power was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.
Similar Installers in Providence
Get a Free Solar Quote from Sunfinity Power
Fill in your details and we'll connect you with Sunfinity Power.
Quote request sent!
Sunfinity Power will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile