Sunlight Solar
Florida's top-ranked local residential solar installer, serving Central Florida since 2003
23+
Years in Business
60
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About Sunlight Solar
Sunlight Solar is a state-certified solar and electrical contractor headquartered at 1106 W. Central Boulevard in Orlando, Florida. Established in 2003, the company has over two decades of experience designing and installing solar panel systems for residential customers across Central Florida. The team brings more than 40 years of combined solar energy expertise.
The company holds both State Certified Solar Contractor (CVC56975) and State Certified Electrical Contractor (EC13008138) licenses. Sunlight Solar has been recognized as Florida’s number-one ranked local residential solar installer and ranked among the Top 40 in the United States on the 2024 Top Solar Contractors list. The company has maintained an A+ BBB rating since its accreditation in 2015.
Sunlight Solar installs panels from Silfab and Q CELLS paired with SolarEdge and Enphase inverter systems. In addition to solar PV, the company offers solar water heaters, solar pool heaters, and roofing services to homeowners throughout Orange, Seminole, Osceola, and surrounding counties.
Service Area
Sunlight Solar serves the following areas within a 50-mile radius:
Contact Information
Are you Sunlight Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.3
60 reviews
Verified Customer
Sunlight Solar did a fantastic job on our installation. The team was efficient and the system has been generating exactly as projected.
Verified Customer
Professional from the first call to the final inspection. They walked us through every step and answered all our questions patiently.
Verified Customer
Good overall experience. Installation was completed on time and the crew was respectful of our property.
Frequently Asked Questions About Sunlight Solar
What services does Sunlight Solar offer?
Sunlight Solar offers Solar Installation, Battery Storage, Maintenance.
Is Sunlight Solar NABCEP certified?
Sunlight Solar holds the following certifications: State Certified Solar Contractor, State Certified Electrical Contractor. Contact them directly for the latest accreditation details.
What areas does Sunlight Solar serve?
Sunlight Solar serves Orlando, Winter Park, Kissimmee, Sanford, Daytona Beach. They are based in Orlando with a service radius of 80 km.
What warranty does Sunlight Solar offer?
Sunlight Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Sunlight Solar's customer reviews?
Sunlight Solar has a 4.3/5 rating based on 60 customer reviews. They are well-regarded by their customers.
How long has Sunlight Solar been in business?
Sunlight Solar was founded in 2003 and has been in business for 23 years. They are one of the more experienced solar installers in their area.
Similar Installers in Orlando
Get a Free Solar Quote from Sunlight Solar
Fill in your details and we'll connect you with Sunlight Solar.
Quote request sent!
Sunlight Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile