SG

Sunlite Group

Highly accredited family-run solar and renewable energy installer across Suffolk and Essex

Ipswich, UK
4.8 (60 reviews)
Verified
Residential Commercial

8+

Years in Business

0

60

Customer Reviews

80 km

Service Area

11-50

Employees

SurgePV Score

8.6 / 10
Customer Reviews
96%
Certifications
75%
Experience
85%
Services Range
90%
Warranty Coverage
63%
Online Presence
100%

About Sunlite Group

Sunlite Group is a highly accredited, family-run renewable energy company founded in 2018. The company operates from Unit 50, Martlesham Creek Business Park, Sandy Lane, Woodbridge, Suffolk IP12 4SD and provides solar PV installation, battery storage, and EV charge point installation services across Suffolk, Essex, Cambridgeshire, Norwich, and Peterborough.

The company is listed on the Suffolk Business Directory and holds MCS certification for solar PV and battery storage installations. Sunlite Group is also approved under the Office for Zero Emission Vehicles (OZEV) residential and commercial charge point grant schemes, allowing customers to access government funding for EV charger installations. Their Checkatrade profile at Martlesham, Woodbridge shows their professional accreditation and quality record.

Sunlite Group serves homeowners and businesses across the region, offering domestic and commercial solar design, installation, and ongoing servicing. The company can be contacted by phone on 01473 599300 or by email at [email protected].

Service Area

Sunlite Group serves the following areas within a 80 km radius:

IpswichWoodbridgeColchesterNorwichCambridgePeterborough

Are you Sunlite Group?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance

Certifications & Accreditations

MCS OZEV

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Sunlite Group

What services does Sunlite Group offer?

Sunlite Group offers Solar Installation, Battery Storage, EV Charging, Maintenance.

Is Sunlite Group MCS certified?

Yes, Sunlite Group is MCS certified and also holds OZEV certification. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Sunlite Group serve?

Sunlite Group serves Ipswich, Woodbridge, Colchester, Norwich, Cambridge, Peterborough. They are based in Ipswich with a service radius of 80 km.

What warranty does Sunlite Group offer?

Sunlite Group offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Sunlite Group's customer reviews?

Sunlite Group has a 4.8/5 rating based on 60 customer reviews. Customers consistently rate them highly.

How long has Sunlite Group been in business?

Sunlite Group was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Sunlite Group

Fill in your details and we'll connect you with Sunlite Group.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote