SunVena Solar
Award-winning Florida solar installer with 600+ five-star Google reviews
8+
Years in Business
603
Customer Reviews
75 mi
Service Area
51-200
Employees
SurgePV Score
About SunVena Solar
SunVena Solar is an award-winning solar installation company based at 4005 Church Street in Sanford, Florida, serving the greater Orlando metro area and beyond. The company has built a reputation for transparent pricing and quality installations, earning over 600 five-star Google reviews and a 4.8-star overall rating. SunVena holds an A+ BBB rating, which it has maintained since accreditation in February 2020.
SunVena designs high-performance solar systems tailored to each homeowner’s energy consumption patterns and roof characteristics. The company handles every phase of the project from initial assessment and engineering through permitting, installation, and utility interconnection. SunVena’s service area extends from Daytona Beach through Central Florida to Tampa.
The company has grown into one of Florida’s largest residential solar installers, with thousands of installations completed across the state. SunVena emphasizes a consultative sales approach with no-pressure evaluations and detailed energy production estimates before homeowners commit to a project.
Service Area
SunVena Solar serves the following areas within a 75-mile radius:
Contact Information
Are you SunVena Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
603 reviews
Verified Customer
SunVena made the whole process easy. From the initial quote to the final inspection, the team communicated clearly and delivered a quality installation.
Verified Customer
Very satisfied with the installation and the customer service. The system has been performing above projections since it was activated.
Verified Customer
Transparent pricing with no hidden costs. The installation crew was courteous and efficient. Would recommend to anyone in Central Florida.
Frequently Asked Questions About SunVena Solar
What services does SunVena Solar offer?
SunVena Solar offers Solar Installation, Battery Storage, system_design.
Is SunVena Solar NABCEP certified?
SunVena Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does SunVena Solar serve?
SunVena Solar serves Orlando, Sanford, Daytona Beach, Tampa, Melbourne. They are based in Orlando with a service radius of 120 km.
What warranty does SunVena Solar offer?
SunVena Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are SunVena Solar's customer reviews?
SunVena Solar has a 4.8/5 rating based on 603 customer reviews. Customers consistently rate them highly.
How long has SunVena Solar been in business?
SunVena Solar was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.
Similar Installers in Orlando
Get a Free Solar Quote from SunVena Solar
Fill in your details and we'll connect you with SunVena Solar.
Quote request sent!
SunVena Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile