Tayside Solar
Local solar PV and battery storage specialists serving Dundee and Tayside
2026+
Years in Business
50 km
Service Area
1-10
Employees
SurgePV Score
About Tayside Solar
Tayside Solar is a Dundee-based solar PV installation company serving residential and commercial customers across the Tayside region of Scotland. Operating from Dundee, the company covers the surrounding area including Perth, Forfar, Arbroath, and St Andrews, providing solar panel installation and battery storage services for homes and small businesses.
The company holds MCS certification, which is required for installations to qualify for the Smart Export Guarantee and ensures that systems are installed to nationally recognised quality standards. Tayside Solar handles the full installation process from initial site survey through to commissioning and grid connection.
As a local operator, Tayside Solar offers customers direct access to the installation team throughout the project, from pre-installation survey to post-installation support and maintenance. Their focus on the Dundee and Tayside area means shorter response times for both new installations and follow-up service.
Service Area
Tayside Solar serves the following areas within a 50 km radius:
Contact Information
Are you Tayside Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
No reviews yet.
Frequently Asked Questions About Tayside Solar
What services does Tayside Solar offer?
Tayside Solar offers Solar Installation, Battery Storage, Maintenance.
Is Tayside Solar MCS certified?
Yes, Tayside Solar is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Tayside Solar serve?
Tayside Solar serves Dundee, Perth, Forfar, Arbroath, St Andrews. They are based in Dundee with a service radius of 50 km.
What warranty does Tayside Solar offer?
Tayside Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Tayside Solar's customer reviews?
Tayside Solar does not have any reviews yet. Be the first to leave a review after using their services.
How long has Tayside Solar been in business?
Tayside Solar was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Dundee
Get a Free Solar Quote from Tayside Solar
Fill in your details and we'll connect you with Tayside Solar.
Quote request sent!
Tayside Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile