TE

TEC Electrical & Solar

NAPIT and City & Guilds verified electrical and solar installation specialists serving Brighton, Worthing, and West Sussex

Brighton, UK
4.8 (45 reviews)
Verified
Residential Commercial

22+

Years in Business

45

Customer Reviews

60 km

Service Area

2-10

Employees

SurgePV Score

8.3 / 10
Customer Reviews
96%
Certifications
90%
Experience
100%
Services Range
90%
Warranty Coverage
0%
Online Presence
75%

About TEC Electrical & Solar

TEC Electrical & Solar Ltd is an electrical and solar installation company based in Worthing, West Sussex, with over 20 years of experience serving residential and commercial clients across Brighton, Worthing, West Sussex, Hampshire, Surrey, and East Sussex. Founded by Simon Bedson, the company has built a reputation for combining traditional electrical expertise with modern renewable energy solutions, offering solar PV system design and installation, battery storage, and EV charger fitting alongside full electrical contracting services.

The company’s team members are verified by City & Guilds, NAPIT, and the Government’s TrustMark scheme, meaning all installations meet certified quality standards. TEC Electrical & Solar provides a complete service from initial consultation and system design through to installation and aftercare. Their electrical background gives them a particular strength in integrating solar systems with existing domestic and commercial electrical setups, including consumer unit upgrades, rewiring, and smart energy management systems.

Customers consistently praise the company for clear communication, neat workmanship, and reliable aftercare. TEC Electrical & Solar maintains a strong presence on Checkatrade and through direct customer referrals, with positive reviews highlighting the team’s technical knowledge, punctuality, and willingness to explain system performance and maintenance requirements to homeowners new to solar energy.

Service Area

TEC Electrical & Solar serves the following areas within a 60 km radius:

BrightonWorthingHoveChichesterCrawleyHorsham

Are you TEC Electrical & Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance

Certifications & Accreditations

NAPIT City & Guilds TrustMark

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4.8

45 reviews

Martin J

8 November 2025
Verified Customer

Brilliant communication, professional and efficient. The TEC team installed our solar panels quickly and neatly, and took time to explain how to get the most out of the system.

Karen S

25 September 2025
Verified Customer

Knowledgeable, friendly and neat. Simon and his team were a pleasure to deal with and the installation was completed to a very high standard. Would definitely use again.

Robert F

14 July 2025
Verified Customer

TEC Electrical were fantastic. They handled everything from the initial survey through to installation and follow-up. The solar panels are generating more than we expected.

Frequently Asked Questions About TEC Electrical & Solar

What services does TEC Electrical & Solar offer?

TEC Electrical & Solar offers Solar Installation, Battery Storage, EV Charging, Maintenance.

Is TEC Electrical & Solar MCS certified?

TEC Electrical & Solar holds the following certifications: NAPIT, City & Guilds, TrustMark. Contact them directly for the latest accreditation details.

What areas does TEC Electrical & Solar serve?

TEC Electrical & Solar serves Brighton, Worthing, Hove, Chichester, Crawley, Horsham. They are based in Brighton with a service radius of 60 km.

What warranty does TEC Electrical & Solar offer?

Contact TEC Electrical & Solar directly for their current warranty terms.

How are TEC Electrical & Solar's customer reviews?

TEC Electrical & Solar has a 4.8/5 rating based on 45 customer reviews. Customers consistently rate them highly.

How long has TEC Electrical & Solar been in business?

TEC Electrical & Solar was founded in 2004 and has been in business for 22 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from TEC Electrical & Solar

Fill in your details and we'll connect you with TEC Electrical & Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote