TL

The Little Green Energy Company

Which? Trusted Trader and certified Tesla Powerwall installer serving Brighton, Hove, and the South East since 2010

Brighton, UK
4.9 (250 reviews)
Verified
Residential Commercial

16+

Years in Business

250

Customer Reviews

100 km

Service Area

11-50

Employees

SurgePV Score

8.6 / 10
Customer Reviews
98%
Certifications
100%
Experience
100%
Services Range
90%
Warranty Coverage
0%
Online Presence
75%

About The Little Green Energy Company

The Little Green Energy Company (TLGEC) is a renewable energy specialist that has been installing solar PV systems across Brighton, Hove, Kent, and the wider South East since 2010. The company was among the first certified Tesla Powerwall installers in the UK and has built a track record of over 1,000 solar panel system installations and maintenance projects. They hold Which? Trusted Trader status and are a Checkatrade-approved supplier with more than 250 five-star reviews across Which?, Google, Facebook, and Checkatrade.

TLGEC offers a full range of renewable energy services including solar PV installation, battery storage systems, EV charging points, and ongoing maintenance and monitoring. Their MCS certification ensures that all installations qualify for the Smart Export Guarantee. The company works with both residential and commercial clients, providing bespoke system designs tailored to each property’s requirements and energy consumption patterns.

Based in Cranbrook, Kent, the company’s experienced team travels throughout the South East to serve customers in Brighton and Hove, East Sussex, and beyond. Their long-standing reputation has been built on detailed site assessments, transparent pricing, and responsive aftercare support, with their engineering team available for system checks and troubleshooting long after the initial installation is complete.

Service Area

The Little Green Energy Company serves the following areas within a 100 km radius:

BrightonHoveCranbrookTunbridge WellsMaidstoneEastbourne

Are you The Little Green Energy Company?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance
Monitoring

Certifications & Accreditations

MCS Which? Trusted Trader Checkatrade Tesla Certified

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4.9

250 reviews

David W

5 December 2025
Verified Customer

TLGEC were fantastic from initial consultation through to installation. Their knowledge of Tesla Powerwall systems is second to none, and the whole team were professional and efficient.

Rachel M

18 October 2025
Verified Customer

We had solar panels and a battery storage system installed. The team were punctual, tidy and very thorough. Everything was explained clearly and the system is working brilliantly.

Graham P

30 August 2025
Verified Customer

Excellent company. They surveyed our property, designed a system that maximises our roof space, and installed it all within the timeframe they promised. Very happy with the results.

Frequently Asked Questions About The Little Green Energy Company

What services does The Little Green Energy Company offer?

The Little Green Energy Company offers Solar Installation, Battery Storage, EV Charging, Maintenance, Monitoring.

Is The Little Green Energy Company MCS certified?

Yes, The Little Green Energy Company is MCS certified and also holds Which? Trusted Trader, Checkatrade, Tesla Certified certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does The Little Green Energy Company serve?

The Little Green Energy Company serves Brighton, Hove, Cranbrook, Tunbridge Wells, Maidstone, Eastbourne. They are based in Brighton with a service radius of 100 km.

What warranty does The Little Green Energy Company offer?

Contact The Little Green Energy Company directly for their current warranty terms.

How are The Little Green Energy Company's customer reviews?

The Little Green Energy Company has a 4.9/5 rating based on 250 customer reviews. Customers consistently rate them highly.

How long has The Little Green Energy Company been in business?

The Little Green Energy Company was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from The Little Green Energy Company

Fill in your details and we'll connect you with The Little Green Energy Company.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote