The Solar Co.
Specialist solar panel, battery, and EV charger installers in London and the South East
6+
Years in Business
92
Customer Reviews
60 km
Service Area
SurgePV Score
About The Solar Co.
The Solar Co. (officially The Solar & Renewables Co. Ltd, company number 12428235) is a specialist solar installer based at 21-23 Elmfield Road, Bromley, Kent. Founded in 2020, the company focuses on residential solar panel, battery storage, and EV charger installations across London and the South East. They are a Which? Trusted Trader, MCS-certified, HIES-accredited, TrustMark-certified, and an Octopus Trusted Partner.
The company installs panels from Canadian Solar and JA Solar, paired with inverters from SolarEdge, Solis, and SunSynk, and offers Tesla Powerwall battery storage. They also install EV chargers from Ohme and Zappi. The Solar Co. reports that customers save over £3,000 annually on average, with a typical payback period of 4.7 years. All installations come with a 10-year workmanship guarantee alongside 25-year manufacturer panel warranties.
On Trustpilot, The Solar Co. holds a 4.9-star rating from 92 reviews. Customers regularly highlight the company’s professionalism, clear communication, and fast installation times. Director George Penny leads site surveys using drone and camera technology to ensure accurate system design before installation begins.
Service Area
The Solar Co. serves the following areas within a 60 km radius:
Contact Information
Are you The Solar Co.?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.9
92 reviews
James McGrane
Very professional, good value, great service. George came out with his drone and camera and measured all dimensions. The install was quick and done well with minimal disruption. When bird mesh came loose 9 months later, they came out and fixed it for free without hesitation.
Mel B
Great experience from start to finish. They recommended the right EV charger and explained everything clearly. Mark and George were punctual, friendly, and knowledgeable. Work was completed neatly to a very high standard with excellent communication throughout.
Dave
Pre-installation discussions were easy and straightforward. Installation was staggeringly fast, 8am to 4pm. System started generating electricity immediately despite no sunshine. Excellent service both before and after installation.
Frequently Asked Questions About The Solar Co.
What services does The Solar Co. offer?
The Solar Co. offers Solar Installation, Battery Storage, EV Charging.
Is The Solar Co. MCS certified?
Yes, The Solar Co. is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does The Solar Co. serve?
The Solar Co. serves London, Bromley, Kent. They are based in London with a service radius of 60 km.
What warranty does The Solar Co. offer?
The Solar Co. offers 25-year panel warranty, and 10-year installation/workmanship warranty.
How are The Solar Co.'s customer reviews?
The Solar Co. has a 4.9/5 rating based on 92 customer reviews. Customers consistently rate them highly.
How long has The Solar Co. been in business?
The Solar Co. was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.
Similar Installers in London
Get a Free Solar Quote from The Solar Co.
Fill in your details and we'll connect you with The Solar Co..
Quote request sent!
The Solar Co. will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile