The Solar Roofers
Local Nashville solar and battery specialists handling installations from roof review through monitoring setup
6+
Years in Business
15
Customer Reviews
93 mi
Service Area
1-10
Employees
SurgePV Score
About The Solar Roofers
The Solar Roofers is a Nashville-based solar installation company operating from 935 East Trinity Lane, Suite 3, in Nashville. The company specializes exclusively in solar panel and battery system installations for residential and commercial properties. Their crews manage every step of the process: roof and structure review, electrical inspection, system design, permitting, panel and racking installation, battery and main panel work, utility coordination, and monitoring setup.
The company works with equipment from multiple manufacturers, installing Canadian Solar panels alongside inverters from Tesla, Enphase, SolarEdge, and Sol-Ark. Battery options include Tesla Powerwall, Generac PWRcell, and Enphase IQ Battery systems. The Solar Roofers’ dual focus on roofing and solar means the team evaluates roof condition and structural integrity as part of every project before panel installation begins.
The Solar Roofers serves neighborhoods across Nashville including East Nashville, Inglewood, 12 South, Belmont, Green Hills, Belle Meade, Bellevue, Donelson, Hermitage, and Madison, as well as surrounding counties. The company also takes projects in Chattanooga and Clarksville.
Service Area
The Solar Roofers serves the following areas within a 93-mile radius:
Contact Information
Are you The Solar Roofers?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
15 reviews
Andrew R.
The Solar Roofers handled our project from the roof assessment all the way through monitoring setup. Their focus on both the roofing and solar aspects gave us confidence that the installation was done right.
Michelle T.
Appreciated the thorough structural review before any panels went up. The crew was careful with our property and the system has been producing well since commissioning.
Greg P.
Good local company with knowledgeable staff. The installation went smoothly and the battery backup has been reliable. Communication was solid throughout the process.
Frequently Asked Questions About The Solar Roofers
What services does The Solar Roofers offer?
The Solar Roofers offers Solar Installation, Battery Storage, Solar Design, Roof Assessment, Grid Connection, Monitoring.
Is The Solar Roofers NABCEP certified?
The Solar Roofers holds the following certifications: Licensed Contractor. Contact them directly for the latest accreditation details.
What areas does The Solar Roofers serve?
The Solar Roofers serves Nashville, East Nashville, Brentwood, Franklin, Green Hills, Belle Meade, Hermitage, Madison and 2 other areas. They are based in Nashville with a service radius of 150 km.
What warranty does The Solar Roofers offer?
The Solar Roofers offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are The Solar Roofers's customer reviews?
The Solar Roofers has a 4.7/5 rating based on 15 customer reviews. Customers consistently rate them highly.
How long has The Solar Roofers been in business?
The Solar Roofers was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.
Similar Installers in Nashville
Get a Free Solar Quote from The Solar Roofers
Fill in your details and we'll connect you with The Solar Roofers.
Quote request sent!
The Solar Roofers will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile