TL

The Little Green Energy Company

Award-winning MCS certified solar PV, battery storage and EV charging specialists serving Maidstone and Kent since 2010

Maidstone, UK
4.9 (250 reviews)
Verified
Residential Commercial

16+

Years in Business

1,000+

Projects Completed

250

Customer Reviews

80 km

Service Area

11-50

Employees

SurgePV Score

9.4 / 10
Customer Reviews
98%
Certifications
100%
Experience
100%
Services Range
90%
Warranty Coverage
63%
Online Presence
100%

About The Little Green Energy Company

The Little Green Energy Company (TLGEC) is one of the South East’s most established renewable energy installers, serving Maidstone, Kent, and surrounding areas since 2010. The company has completed over 1,000 solar PV installations across Kent, Sussex, and Surrey, and holds Which? Trusted Trader accreditation alongside a Checkatrade-approved supplier designation backed by more than 250 five-star reviews.

TLGEC is one of the UK’s certified Tesla Powerwall battery installers, having been trained directly by Tesla to install home battery storage products. This makes them a strong choice for Maidstone homeowners seeking a combined solar and storage solution. Their engineers are MCS certified, ensuring all systems qualify for the Smart Export Guarantee and comply with DNO connection requirements.

Services cover the full renewable energy spectrum: solar PV design and installation, battery storage, EV charging points, and ongoing maintenance and monitoring. The company works with both residential and commercial clients, tailoring each system to roof type, orientation, shading, and energy consumption. Their head office is based in Cranbrook, Kent — within easy reach of Maidstone and across the county.

TLGEC has received industry recognition including the Small Scale Solar PV Installation of the Year award. Customer feedback consistently highlights the team’s professionalism, technical knowledge, and thorough aftercare support.

Service Area

The Little Green Energy Company serves the following areas within a 80 km radius:

MaidstoneCranbrookTonbridgeSevenoaksCanterburyAshford

Are you The Little Green Energy Company?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance
Monitoring

Certifications & Accreditations

MCS Which? Trusted Trader Checkatrade Tesla Certified

Partner Manufacturers

Panels

SunPower

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4.9

250 reviews

Mr & Mrs G

15 June 2024
Verified Customer

TLGEC installed 22 solar panels and 2 Tesla Powerwall batteries. They are working perfectly. One of the most professional, friendly and competent companies I have ever dealt with.

Homeowner, Maidstone

10 March 2024
Verified Customer

After installation our monthly electricity bill dropped from £180 to £5. The team were thorough, tidy and explained everything clearly throughout the whole process.

Frequently Asked Questions About The Little Green Energy Company

What services does The Little Green Energy Company offer?

The Little Green Energy Company offers Solar Installation, Battery Storage, EV Charging, Maintenance, Monitoring.

Is The Little Green Energy Company MCS certified?

Yes, The Little Green Energy Company is MCS certified and also holds Which? Trusted Trader, Checkatrade, Tesla Certified certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does The Little Green Energy Company serve?

The Little Green Energy Company serves Maidstone, Cranbrook, Tonbridge, Sevenoaks, Canterbury, Ashford. They are based in Maidstone with a service radius of 80 km.

What warranty does The Little Green Energy Company offer?

The Little Green Energy Company offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are The Little Green Energy Company's customer reviews?

The Little Green Energy Company has a 4.9/5 rating based on 250 customer reviews. Customers consistently rate them highly.

How long has The Little Green Energy Company been in business?

The Little Green Energy Company was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from The Little Green Energy Company

Fill in your details and we'll connect you with The Little Green Energy Company.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote