TE

TPS Eco

MCS certified heat pump and solar panel installers serving Maidstone and all of Kent since 2022

Maidstone, UK
0 (0 reviews)
Verified
Residential Commercial

4+

Years in Business

1,500+

Projects Completed

40 km

Service Area

11-50

Employees

SurgePV Score

5.4 / 10
Customer Reviews
0%
Certifications
100%
Experience
70%
Services Range
75%
Warranty Coverage
63%
Online Presence
25%

About TPS Eco

TPS Eco is a Maidstone-based renewable energy and heating specialist with a focus on heat pumps, solar panels, air conditioning, and plumbing services across Kent and the South East. The company was established in 2022, though its engineering team carries 15 or more years of combined experience in renewable energy and heating systems.

Operating from Maidstone, TPS Eco covers a 25-mile service radius that includes Tonbridge, Tunbridge Wells, Sevenoaks, Ashford, Sittingbourne, and Canterbury. To date the company has completed over 1,500 projects for more than 800 customers across the county.

All TPS Eco engineers hold MCS certification for both solar panels and heat pumps, Gas Safe registration for gas work, RECC certification for consumer protection, and F-Gas certification for air conditioning systems. This multi-discipline capability means TPS Eco can handle complete home energy upgrades, from solar and battery installation through to heat pump replacement and EV charger fitting, under a single contract. The company can be reached by calling 01622 234 233.

Service Area

TPS Eco serves the following areas within a 40 km radius:

MaidstoneTonbridgeTunbridge WellsSevenoaksAshfordSittingbourneCanterbury

Are you TPS Eco?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

MCS Gas Safe RECC F-Gas

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About TPS Eco

What services does TPS Eco offer?

TPS Eco offers Solar Installation, Battery Storage, Maintenance.

Is TPS Eco MCS certified?

Yes, TPS Eco is MCS certified and also holds Gas Safe, RECC, F-Gas certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does TPS Eco serve?

TPS Eco serves Maidstone, Tonbridge, Tunbridge Wells, Sevenoaks, Ashford, Sittingbourne, Canterbury. They are based in Maidstone with a service radius of 40 km.

What warranty does TPS Eco offer?

TPS Eco offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are TPS Eco's customer reviews?

TPS Eco does not have any reviews yet. Be the first to leave a review after using their services.

How long has TPS Eco been in business?

TPS Eco was founded in 2022 and has been in business for 4 years. They are a newer entrant in the solar installation market.

Get a Free Solar Quote from TPS Eco

Fill in your details and we'll connect you with TPS Eco.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote