Trivium Solar
Memphis solar installer with 16 years of direct-to-consumer experience and partnerships with Solar Insure for comprehensive monitoring
2026+
Years in Business
15
Customer Reviews
50 mi
Service Area
1-10
Employees
SurgePV Score
About Trivium Solar
Trivium Solar is a Memphis-based solar installation company located at 2249 Kirby Parkway, Memphis, TN 38119. The company brings over 5 years of experience in solar and renewable energy, combined with 16 years of direct-to-consumer in-home consultation experience.
Trivium Solar offers residential and commercial solar panel installation, battery storage systems, and SPAN Smart Electrical Panels that provide real-time energy insights for homes, optimizing usage and reducing energy costs. The company partners with Solar Insure to provide comprehensive solar monitoring and warranty solutions for all installations.
Trivium Solar employs licensed and certified electricians who ensure professional, top-quality installations. The company serves homeowners and businesses across the greater Memphis area including Germantown, Bartlett, Collierville, and Cordova.
Service Area
Trivium Solar serves the following areas within a 50-mile radius:
Contact Information
Are you Trivium Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
15 reviews
Verified Customer
Trivium Solar provided a thorough consultation and a seamless installation process. The team was knowledgeable about the latest solar technology and helped us choose the right system for our home.
Verified Customer
Good experience overall. The installation was completed on time and the monitoring system they set up works well. Appreciated their partnership with Solar Insure for the warranty.
Verified Customer
Professional team from start to finish. They explained the SPAN smart panel options clearly and the installation was clean. Our energy bills are noticeably lower.
Frequently Asked Questions About Trivium Solar
What services does Trivium Solar offer?
Trivium Solar offers Solar Installation, Battery Storage, Monitoring.
Is Trivium Solar NABCEP certified?
Trivium Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does Trivium Solar serve?
Trivium Solar serves Memphis, Germantown, Bartlett, Collierville, Cordova. They are based in Memphis with a service radius of 80 km.
What warranty does Trivium Solar offer?
Trivium Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Trivium Solar's customer reviews?
Trivium Solar has a 4.5/5 rating based on 15 customer reviews. Customers consistently rate them highly.
How long has Trivium Solar been in business?
Trivium Solar was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Memphis
Get a Free Solar Quote from Trivium Solar
Fill in your details and we'll connect you with Trivium Solar.
Quote request sent!
Trivium Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile