United Better Homes
Family-owned Rhode Island home improvement company offering solar, roofing, windows, and siding since 2003
23+
Years in Business
400+
Projects Completed
40
Customer Reviews
37 mi
Service Area
11-50
Employees
SurgePV Score
About United Better Homes
United Better Homes is a family-owned home improvement company based at 535 Pine Street in Central Falls, Rhode Island. Operating since 2003, the company has over two decades of experience serving homeowners across the Providence metropolitan area with a full range of services including solar installation, roofing, windows, siding, and doors. Their longevity in the Rhode Island market speaks to the trust they have built with local homeowners.
The company offers residential solar installations using Qcells panels with Enphase microinverter technology and Tesla Powerwall battery storage. United Better Homes is particularly well-suited for homeowners who need a new roof along with their solar installation, as the company can coordinate both projects to save time and money. Their team handles permitting, installation, and utility interconnection for all solar projects.
United Better Homes is BBB accredited and offers free estimates for all their services. The company helps homeowners navigate Rhode Island’s solar incentive programs and provides financing options for solar installations. Their Central Falls office is open Monday through Friday for consultations and customer support.
Service Area
United Better Homes serves the following areas within a 37-mile radius:
Contact Information
Are you United Better Homes?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
40 reviews
Maria G.
United Better Homes replaced our roof and installed solar panels in one project. The coordination was seamless and the crew was professional. Having a single company handle both made the whole process easier.
John D.
Good local company that has been around for over 20 years. The solar installation was clean and the system is performing well. They also gave us a competitive quote on new windows.
Sandra F.
Reliable company with a solid reputation in the community. The solar installation went smoothly and the team was respectful of our property. Happy with the results.
Frequently Asked Questions About United Better Homes
What services does United Better Homes offer?
United Better Homes offers Solar Installation, Battery Storage, roofing, Solar Design, Energy Audit, Grid Connection.
Is United Better Homes NABCEP certified?
United Better Homes holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.
What areas does United Better Homes serve?
United Better Homes serves Providence, Central Falls, Pawtucket, Cranston, Warwick, East Providence, Woonsocket, North Providence. They are based in Providence with a service radius of 60 km.
What warranty does United Better Homes offer?
United Better Homes offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are United Better Homes's customer reviews?
United Better Homes has a 4.5/5 rating based on 40 customer reviews. Customers consistently rate them highly.
How long has United Better Homes been in business?
United Better Homes was founded in 2003 and has been in business for 23 years. They are one of the more experienced solar installers in their area.
Similar Installers in Providence
Get a Free Solar Quote from United Better Homes
Fill in your details and we'll connect you with United Better Homes.
Quote request sent!
United Better Homes will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile