US

Unlimited Solar

Virginia's top-rated solar installer serving Norfolk and Hampton Roads with 5-star EcoWatch rating

Norfolk, Virginia
5 (15 reviews)
Residential

7+

Years in Business

0

15

Customer Reviews

50 mi

Service Area

1-10

Employees

SurgePV Score

6.6 / 10
Customer Reviews
100%
Certifications
0%
Experience
70%
Services Range
90%
Warranty Coverage
63%
Online Presence
75%

About Unlimited Solar

Unlimited Solar is Virginia’s top-rated solar installation company, based at 936 General Booth Boulevard, Suite B, in Virginia Beach, serving Norfolk and the greater Hampton Roads region. The company provides residential solar panel installations with permit assistance, cleaning and maintenance, and financing assistance.

Unlimited Solar is led by owner David Kershaw, who takes a hands-on approach to every installation project. The company handles system design, permitting, installation, and ongoing maintenance for homeowners across the Hampton Roads area including Norfolk, Virginia Beach, Chesapeake, and surrounding communities.

The company has earned EcoWatch’s Best Local Installer designation with a 5.0-star rating and operates Monday through Friday, 8:30 AM to 6:30 PM, with Saturday hours from 9:00 AM to 5:00 PM.

Service Area

Unlimited Solar serves the following areas within a 50-mile radius:

NorfolkVirginia BeachChesapeakePortsmouthHamptonNewport News

Are you Unlimited Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Maintenance
Solar Design
Grid Connection

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

15 reviews

Margaret S.

25 August 2025
Verified Customer

Unlimited Solar is the real deal. They installed our system in Norfolk quickly and professionally. The owner David is responsive and involved in every project.

Raymond W.

18 May 2025
Verified Customer

Virginia's top-rated solar company for a reason. Clean installation, great communication, and our system has been producing above projections since day one.

Deborah K.

12 February 2025
Verified Customer

We chose Unlimited Solar for their local reputation and personal service. The permit assistance and financing guidance made the process smooth and stress-free.

Frequently Asked Questions About Unlimited Solar

What services does Unlimited Solar offer?

Unlimited Solar offers Solar Installation, Maintenance, Solar Design, Grid Connection.

Is Unlimited Solar NABCEP certified?

Unlimited Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Unlimited Solar serve?

Unlimited Solar serves Norfolk, Virginia Beach, Chesapeake, Portsmouth, Hampton, Newport News. They are based in Norfolk with a service radius of 80 km.

What warranty does Unlimited Solar offer?

Unlimited Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Unlimited Solar's customer reviews?

Unlimited Solar has a 5/5 rating based on 15 customer reviews. Customers consistently rate them highly.

How long has Unlimited Solar been in business?

Unlimited Solar was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Unlimited Solar

Fill in your details and we'll connect you with Unlimited Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote