US

Urban Solar

Florida's premier solar installer with over 10,000 completed installations since 2008

Miami, Florida
4.2 (22 reviews)
Verified
Residential Commercial

18+

Years in Business

10,000+

Projects Completed

22

Customer Reviews

93 mi

Service Area

51-200

Employees

SurgePV Score

8.7 / 10
Customer Reviews
84%
Certifications
100%
Experience
100%
Services Range
100%
Warranty Coverage
63%
Online Presence
50%

About Urban Solar

Urban Solar is a Florida-based solar installation company established in 2008 that has grown from a one-person operation into a multi-million dollar business with over 10,000 completed installations. Headquartered in Boca Raton at 1225 Broken Sound Pkwy NW, the company serves residential and commercial customers throughout South Florida including Miami, Fort Lauderdale, and West Palm Beach. Urban Solar was selected as the preferred contractor for Lennar Corp’s solar subsidiary, Sunstreet Energy Group.

The company holds both a state-certified solar contractor license (CVC56948) and a state-certified electrical contractor license. Urban Solar is a Tesla Powerwall Certified Installer and an Enphase Platinum Installer. They work with panels from Q Cells, Jinko Solar, and Mission Solar, paired with inverter technology from Enphase, SolarEdge, and SMA. Beyond standard solar PV installations, Urban Solar also offers solar pool heating and solar attic fan services.

Urban Solar maintains a 4.2-star rating on Houzz with 22 reviews on Yelp. The company has built a reputation for customized system design and transparent pricing. Customers note the company’s white-glove service approach and experienced installation crews, though some reviews mention occasional communication delays during the permitting process.

Service Area

Urban Solar serves the following areas within a 93-mile radius:

MiamiFort LauderdaleBoca RatonWest Palm BeachMiami BeachCoral GablesHollywoodPompano Beach

Are you Urban Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Monitoring
Solar Design
Roof Assessment

Certifications & Accreditations

State Certified Solar Contractor State Certified Electrical Contractor Tesla Powerwall Certified Installer Enphase Platinum Installer

Partner Manufacturers

Panels

Q CellsJinko SolarMission Solar

Inverters

EnphaseSolarEdgeSMA

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.2

22 reviews

Michael P.

5 September 2025
Verified Customer

Urban Solar installed a 12 kW system on my Miami home. The crew was efficient and respectful of the property. Production numbers have matched the proposal exactly.

Laura K.

18 June 2025
Verified Customer

Good experience overall. The system works great and the price was competitive. Communication could have been slightly better during the permitting phase, but the end result is excellent.

James W.

2 March 2025
Verified Customer

We chose Urban Solar for our commercial building and they delivered a clean, professional installation. Their experience with large-scale projects was evident from the first meeting.

Frequently Asked Questions About Urban Solar

What services does Urban Solar offer?

Urban Solar offers Solar Installation, Battery Storage, Maintenance, Monitoring, Solar Design, Roof Assessment.

Is Urban Solar NABCEP certified?

Urban Solar holds the following certifications: State Certified Solar Contractor, State Certified Electrical Contractor, Tesla Powerwall Certified Installer, Enphase Platinum Installer. Contact them directly for the latest accreditation details.

What areas does Urban Solar serve?

Urban Solar serves Miami, Fort Lauderdale, Boca Raton, West Palm Beach, Miami Beach, Coral Gables, Hollywood, Pompano Beach. They are based in Miami with a service radius of 150 km.

What warranty does Urban Solar offer?

Urban Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Urban Solar's customer reviews?

Urban Solar has a 4.2/5 rating based on 22 customer reviews. They are well-regarded by their customers.

How long has Urban Solar been in business?

Urban Solar was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Urban Solar

Fill in your details and we'll connect you with Urban Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote