Virginia Energy Solutions
Locally owned Richmond solar installer offering custom residential and commercial systems with flexible financing options
5+
Years in Business
30
Customer Reviews
75 mi
Service Area
2-10
Employees
SurgePV Score
About Virginia Energy Solutions
Virginia Energy Solutions is a locally owned and operated solar installation company based at 620 Moorefield Park Drive, Suite 203 in Richmond, Virginia. Founded in 2021 by CEO Ian Marston, the company focuses on making residential solar power accessible through custom system designs, transparent pricing, and flexible financing options including plans with no out-of-pocket expenses. Virginia Energy Solutions installs panels from Qcells and LG Solar with Enphase microinverters and offers battery storage, generators, roofing, and tree removal services alongside solar.
The company handles the full project lifecycle from initial consultation and roof assessment through permitting, installation, and system activation. Virginia Energy Solutions operates Monday through Friday with Saturday availability and emphasizes quick turnaround times, with many customers reporting their systems were operational within weeks of the initial consultation.
Virginia Energy Solutions holds an A+ BBB rating and a 4.9-star average across review platforms, with approximately 30 reviews. Customers consistently praise the company’s straightforward communication, lack of high-pressure sales tactics, and the quality of installation work. The company is recognized as a Market Leader by third-party review aggregators based on its strong customer feedback and growing presence in the Richmond solar market.
Service Area
Virginia Energy Solutions serves the following areas within a 75-mile radius:
Contact Information
Are you Virginia Energy Solutions?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
30 reviews
Sandra K.
Virginia Energy Solutions walked us through every step of the process. The team was responsive and installation was completed within three weeks. Our electric bill has dropped by about 70 percent.
Chris B.
Ian and his team were upfront about costs and realistic about energy savings. No high-pressure sales tactics. The installation crew was courteous and left our property clean. Panels have been producing as promised.
Linda M.
Great local company. They helped us understand the financing options and the timeline was accurate. The technicians were professional and answered all our questions during the install.
Frequently Asked Questions About Virginia Energy Solutions
What services does Virginia Energy Solutions offer?
Virginia Energy Solutions offers Solar Installation, Solar Design, Battery Storage, Maintenance, Roof Assessment, financing_assistance.
Is Virginia Energy Solutions NABCEP certified?
Virginia Energy Solutions holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.
What areas does Virginia Energy Solutions serve?
Virginia Energy Solutions serves Richmond, Midlothian, Chesterfield, Henrico, Glen Allen, Mechanicsville. They are based in Richmond with a service radius of 120 km.
What warranty does Virginia Energy Solutions offer?
Virginia Energy Solutions offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Virginia Energy Solutions's customer reviews?
Virginia Energy Solutions has a 4.9/5 rating based on 30 customer reviews. Customers consistently rate them highly.
How long has Virginia Energy Solutions been in business?
Virginia Energy Solutions was founded in 2021 and has been in business for 5 years. They have solid experience in the solar industry.
Similar Installers in Richmond
Get a Free Solar Quote from Virginia Energy Solutions
Fill in your details and we'll connect you with Virginia Energy Solutions.
Quote request sent!
Virginia Energy Solutions will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile