Viridis Energy
Over 30 years of solar sales and installation experience serving Worcester and all of Massachusetts
33+
Years in Business
25
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About Viridis Energy
Viridis Energy is a solar installation company based in Woburn, MA with over 30 years of experience in solar sales and installation. The company serves Worcester and all of Massachusetts, providing custom residential and commercial solar solutions designed for maximum energy production and long-term savings.
Viridis Energy has completed solar installations throughout Worcester County, with documented projects in the city of Worcester visible on their project portfolio. The company offers end-to-end service from initial site assessment and energy analysis through system design, permitting, installation, and utility interconnection.
The company helps customers navigate Massachusetts solar incentives including the SMART program, net metering credits, and available state tax credits. Viridis Energy provides battery storage options for backup power and increased energy independence.
Service Area
Viridis Energy serves the following areas within a 62-mile radius:
Contact Information
Are you Viridis Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
25 reviews
Steve M.
Viridis Energy designed a custom system for our Worcester home. With 30+ years in the industry, their experience really showed in how they handled the roof layout and shading analysis.
Nancy B.
Good experience from consultation to installation. They provided a thorough energy assessment and helped us understand the payback timeline with Massachusetts solar incentives.
Paul W.
We had a complex roof with multiple angles and Viridis designed around every challenge. The system has been producing consistently since installation.
Frequently Asked Questions About Viridis Energy
What services does Viridis Energy offer?
Viridis Energy offers Solar Installation, Battery Storage, Solar Design, Monitoring.
Is Viridis Energy NABCEP certified?
Viridis Energy holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does Viridis Energy serve?
Viridis Energy serves Worcester, Woburn, Boston, Cambridge, Lowell, Springfield. They are based in Worcester with a service radius of 100 km.
What warranty does Viridis Energy offer?
Viridis Energy offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Viridis Energy's customer reviews?
Viridis Energy has a 4.5/5 rating based on 25 customer reviews. Customers consistently rate them highly.
How long has Viridis Energy been in business?
Viridis Energy was founded in 1993 and has been in business for 33 years. They are one of the more experienced solar installers in their area.
Similar Installers in Worcester
Get a Free Solar Quote from Viridis Energy
Fill in your details and we'll connect you with Viridis Energy.
Quote request sent!
Viridis Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile