W

WindSoleil

Renewable energy company providing residential and commercial solar and wind solutions in Chicago

Chicago, Illinois
4.5 (30 reviews)
Verified
Residential Commercial

16+

Years in Business

0

30

Customer Reviews

50 mi

Service Area

1-10

Employees

SurgePV Score

7.7 / 10
Customer Reviews
90%
Certifications
60%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
50%

About WindSoleil

WindSoleil is a renewable energy company headquartered at 401 N. Trumbull Ave, Suite D in Chicago. The company provides residential and commercial solar panel installation, solar thermal systems, solar pool heating, energy audits, and wind energy solutions across the Chicagoland area. WindSoleil also offers solar maintenance services.

The company has been BBB accredited since March 2025 and holds strong ratings across third-party review platforms, including a 5.0 on EcoWatch and Angi, and a 4.1 on TrustAnalytica. WindSoleil is rated among the most reputable local solar companies in Chicago by EcoWatch’s team of experts.

WindSoleil serves homeowners and businesses throughout the greater Chicago metropolitan area, handling the full installation process from initial energy audit through system design, permitting, installation, and grid interconnection. They are knowledgeable about Illinois solar incentive programs including Illinois Shines and Solar for All.

Service Area

WindSoleil serves the following areas within a 50-mile radius:

ChicagoEvanstonOak ParkNapervilleSchaumburg

Are you WindSoleil?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

NABCEP

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

30 reviews

Derek M.

14 September 2025
Verified Customer

WindSoleil did a great job on our residential solar installation. The team was professional, communicative, and completed the work on schedule. Our energy bills have dropped significantly.

Patricia L.

22 July 2025
Verified Customer

Excellent local solar company. They handled everything from design to permitting to installation. Very knowledgeable about Illinois solar incentives and programs.

James W.

18 May 2025
Verified Customer

Good installation and responsive team. The process took a bit longer than expected due to utility approvals but WindSoleil kept us informed throughout.

Frequently Asked Questions About WindSoleil

What services does WindSoleil offer?

WindSoleil offers Solar Installation, Battery Storage, Maintenance.

Is WindSoleil NABCEP certified?

Yes, WindSoleil is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does WindSoleil serve?

WindSoleil serves Chicago, Evanston, Oak Park, Naperville, Schaumburg. They are based in Chicago with a service radius of 80 km.

What warranty does WindSoleil offer?

WindSoleil offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are WindSoleil's customer reviews?

WindSoleil has a 4.5/5 rating based on 30 customer reviews. Customers consistently rate them highly.

How long has WindSoleil been in business?

WindSoleil was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from WindSoleil

Fill in your details and we'll connect you with WindSoleil.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote