WR

Worcester Renewables Ltd

Family renewables business with over 25 years of experience serving Worcestershire and beyond

Worcester, UK
0 (0 reviews)
Verified
Residential Commercial

36+

Years in Business

0

60 km

Service Area

1-10

Employees

SurgePV Score

5.7 / 10
Customer Reviews
0%
Certifications
60%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
75%

About Worcester Renewables Ltd

Worcester Renewables Ltd is a long-established family business based in the Vale of Evesham, Worcestershire, with over 25 years of experience in renewable energy design and installation. Founded in 1990, the company has served domestic and commercial customers across Worcestershire and neighbouring counties for decades. The business can be reached at 01386 871490 or [email protected].

The company designs, supplies, and installs complete renewable energy systems including Solar PV, Solar Thermal, Air Source and Ground Source Heat Pumps, Biomass Boilers, and Mechanical Ventilation and Heat Recovery (MVHR). Worcester Renewables Ltd holds MCS certification for solar PV and thermal installations, ensuring all installations meet the standards required for Smart Export Guarantee (SEG) eligibility.

Worcester Renewables serves clients across Worcester, Evesham, Pershore, Redditch, Stratford-upon-Avon, and Cheltenham. The company is registered on the Graven Hill trade directory and the Link to Energy installer network. Its long history in the industry means it brings substantial expertise to both straightforward domestic installations and complex commercial renewable energy projects.

Service Area

Worcester Renewables Ltd serves the following areas within a 60 km radius:

WorcesterEveshamPershoreRedditchStratford-upon-AvonCheltenham

Are you Worcester Renewables Ltd?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Energy Audit

Certifications & Accreditations

MCS

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Worcester Renewables Ltd

What services does Worcester Renewables Ltd offer?

Worcester Renewables Ltd offers Solar Installation, Battery Storage, Energy Audit.

Is Worcester Renewables Ltd MCS certified?

Yes, Worcester Renewables Ltd is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Worcester Renewables Ltd serve?

Worcester Renewables Ltd serves Worcester, Evesham, Pershore, Redditch, Stratford-upon-Avon, Cheltenham. They are based in Worcester with a service radius of 60 km.

What warranty does Worcester Renewables Ltd offer?

Worcester Renewables Ltd offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Worcester Renewables Ltd's customer reviews?

Worcester Renewables Ltd does not have any reviews yet. Be the first to leave a review after using their services.

How long has Worcester Renewables Ltd been in business?

Worcester Renewables Ltd was founded in 1990 and has been in business for 36 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Worcester Renewables Ltd

Fill in your details and we'll connect you with Worcester Renewables Ltd.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote