YH

Your Home Solar

Veteran-owned clean energy and storage specialist providing residential solar installations across East Tennessee

Knoxville, Tennessee
4.5 (6 reviews)
Residential

4+

Years in Business

0

6

Customer Reviews

62 mi

Service Area

2-10

Employees

SurgePV Score

5.9 / 10
Customer Reviews
90%
Certifications
0%
Experience
70%
Services Range
60%
Warranty Coverage
63%
Online Presence
75%

About Your Home Solar

Your Home Solar is a veteran-owned and operated solar installation company located at 816 Willow Avenue, Knoxville, TN 37915. Founded in 2022 by owner Ernie Bussell, the company specializes in clean energy and energy storage systems for residential customers across East Tennessee.

Your Home Solar provides top-quality solar installations with responsive post-installation support. The company handles system design, permitting, installation, and TVA grid interconnection for homeowners looking to reduce their energy costs with solar power and battery storage. The company operates as a locally focused installer with direct owner involvement in every project.

Your Home Solar holds a 4.5-star rating from customer reviews and serves Knoxville, Maryville, Sevierville, Lenoir City, and Farragut. The company is known for its no-pressure sales approach and commitment to customer education throughout the solar installation process.

Service Area

Your Home Solar serves the following areas within a 62-mile radius:

KnoxvilleMaryvilleSeviervilleLenoir CityFarragut

Are you Your Home Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

6 reviews

Verified Customer

5 September 2025
Verified Customer

Your Home Solar made the process of going solar simple and straightforward. Ernie and his team were professional and responsive to every question we had.

Verified Customer

18 June 2025
Verified Customer

Great experience with this veteran-owned company. The energy storage system they installed gives us real peace of mind during outages. Highly recommend.

Verified Customer

25 March 2025
Verified Customer

Solid solar installation and the team was knowledgeable about TVA's interconnection requirements. Good post-installation support as well.

Frequently Asked Questions About Your Home Solar

What services does Your Home Solar offer?

Your Home Solar offers Solar Installation, Battery Storage.

Is Your Home Solar NABCEP certified?

Your Home Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Your Home Solar serve?

Your Home Solar serves Knoxville, Maryville, Sevierville, Lenoir City, Farragut. They are based in Knoxville with a service radius of 100 km.

What warranty does Your Home Solar offer?

Your Home Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Your Home Solar's customer reviews?

Your Home Solar has a 4.5/5 rating based on 6 customer reviews. Customers consistently rate them highly.

How long has Your Home Solar been in business?

Your Home Solar was founded in 2022 and has been in business for 4 years. They are a newer entrant in the solar installation market.

Get a Free Solar Quote from Your Home Solar

Fill in your details and we'll connect you with Your Home Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote