Solar Installation Hub

Whether you're assessing your first rooftop or managing dozens of installs a month — this hub covers every step, from roof suitability through commissioning and long-term maintenance.

Start Learning

10 Chapters + Free Resources. From Roof to Switch-On.

We've broken the complete solar installation journey into 10 structured chapters — from checking if your roof is suitable through commissioning and long-term maintenance. Plus a bonus resource pack with free print-ready checklists, worksheets, and templates for every stage.

01

Solar Installation Overview

How solar panels generate electricity, what a complete system includes, and the end-to-end journey from first assessment to switch-on day.

02

Is My Roof Suitable for Solar?

Evaluate any roof for solar potential — orientation, tilt angle, shading obstacles, structural capacity, and how to read satellite assessment data.

03

How Many Solar Panels Do I Need?

Calculate exactly how many panels you need using your annual energy consumption, local peak sun hours, and system loss factors — with worked examples.

04

How to Choose Solar Panels

Compare monocrystalline, polycrystalline, and TOPCon technologies on efficiency, degradation, temperature coefficients, and total cost of ownership.

05

Solar Inverter Selection Guide

String inverters, microinverters, and power optimizers explained — with a decision framework for choosing the right topology for any roof type.

06

Adding Battery Storage to Solar

How to size and integrate a battery system — LFP vs NMC chemistry, AC vs DC coupling, grid connection requirements, and payback economics.

07

Step-by-Step Installation Process

The complete 10-step installation sequence: site prep, mounting, panel fixing, DC wiring, inverter installation, AC connection, earthing, and IEC 62446 commissioning tests.

08

Permits, Grid Connection & DNO

Navigate solar building permits and grid connection applications across Germany, Italy, France, Spain, the UK, and the Netherlands — country by country.

09

Solar Monitoring & Commissioning

IEC 62446 commissioning tests, setting up real-time monitoring from day one, understanding production data, and how to catch underperformance early.

10

Maintenance & Troubleshooting

Annual maintenance schedules, panel cleaning, inverter health checks, and step-by-step troubleshooting for the 10 most common solar problems.

FREE

Free Resources & Templates

6 print-ready tools: pre-installation checklist, roof scorecard, system sizing worksheet, IEC 62446 commissioning checklist, client handover pack, and maintenance schedule.

Who Is This Hub For?

Whether you're a homeowner researching solar for the first time or a professional installer looking to sharpen your process — this hub has you covered.

Homeowners

New to solar? Start with Chapters 1–3 to understand how it works, whether your roof qualifies, and how many panels you'll need.

Installers & Technicians

Chapters 7–9 cover the physical installation process, permitting, and IEC 62446 commissioning tests in detail.

Solar Sales & Designers

Chapters 3–6 on sizing, panel selection, inverters, and batteries give you the technical depth to answer any customer question confidently.