8MSolar
The only fully NABCEP-certified solar installer in North Carolina with in-house engineers and 5,000+ projects completed
11+
Years in Business
5,000+
Projects Completed
262
Customer Reviews
124 mi
Service Area
51-200
Employees
SurgePV Score
About 8MSolar
8MSolar is a top-ranked solar installation company with offices at 5112 Departure Dr, Raleigh, NC 27616, and 1310 SE Maynard Rd, Suite 204-B, Cary, NC 27511. Founded in 2015, the company has installed over 5,000 residential and commercial solar systems across North Carolina and Virginia. 8MSolar is the only solar PV installer in North Carolina that is fully NABCEP certified, operates as a general contractor, and employs in-house licensed and registered professional engineers.
The company holds certifications from every major equipment manufacturer in the industry, including Enphase, Q Cells, SunPower, REC, Tesla, SolarEdge, and Generac. 8MSolar installs panels from Q Cells, SunPower, REC, and Silfab alongside Enphase, SolarEdge, and SMA inverters. Battery storage options include Tesla Powerwall, Enphase, and LG systems. Having in-house engineers means every project receives custom structural and electrical engineering before installation.
8MSolar holds a 5.0-star average from 262 Google reviews and was named EnergySage Local Installer of the Year for North Carolina in both 2025 and 2026. The company also received the North Carolina Sustainable Energy Association Business of the Year award in 2024 and is the No. 1 ranked residential, commercial, government, and non-profit solar installer in NC. All installations include 8MSolar’s industry-leading lifetime warranty on workmanship and roof penetrations.
Service Area
8MSolar serves the following areas within a 124-mile radius:
Contact Information
Are you 8MSolar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
25 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
5
262 reviews
Jennifer A.
8MSolar installed a 10 kW system on our Raleigh home. Their engineer reviewed our roof structure and electrical panel before finalizing the design. The installation crew was professional and finished in one day.
David L.
We got three quotes from Raleigh-area companies and 8MSolar stood out for their engineering depth. They are the only installer we spoke with that had licensed engineers on staff. System is performing above estimates.
Alicia M.
From the first consultation to the final inspection, 8MSolar was responsive and transparent. Their lifetime warranty gave us confidence. The monitoring app shows our system producing 15% above projections.
Frequently Asked Questions About 8MSolar
What services does 8MSolar offer?
8MSolar offers Solar Installation, Battery Storage, Solar Design, Commercial Solar, Energy Audit, Monitoring.
Is 8MSolar NABCEP certified?
8MSolar holds the following certifications: NABCEP Certified, Enphase Certified, Q Cells ProPartner, SunPower Authorized Dealer, REC ProTrust Certified, Tesla Powerwall Certified, SolarEdge Preferred Partner, Generac Certified. Contact them directly for the latest accreditation details.
What areas does 8MSolar serve?
8MSolar serves Raleigh, Cary, Durham, Wake Forest, Chapel Hill, Charlotte, Greensboro, Wilmington. They are based in Raleigh with a service radius of 200 km.
What warranty does 8MSolar offer?
8MSolar offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.
How are 8MSolar's customer reviews?
8MSolar has a 5/5 rating based on 262 customer reviews. Customers consistently rate them highly.
How long has 8MSolar been in business?
8MSolar was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.
Similar Installers in Raleigh
Get a Free Solar Quote from 8MSolar
Fill in your details and we'll connect you with 8MSolar.
Quote request sent!
8MSolar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile