NS

NC Solar Now

Raleigh's locally owned NABCEP-certified solar installer since 2009 with 250+ five-star Google reviews

Raleigh, North Carolina
5 (250 reviews)
Verified
Residential Commercial

17+

Years in Business

250

Customer Reviews

93 mi

Service Area

11-50

Employees

SurgePV Score

9.7 / 10
Customer Reviews
100%
Certifications
100%
Experience
100%
Services Range
90%
Warranty Coverage
80%
Online Presence
100%

About NC Solar Now

NC Solar Now is a locally owned solar installation company headquartered at 2509 Atlantic Ave, Raleigh, NC 27604. Founded in 2009, the company has been one of North Carolina’s most trusted solar installers for over 15 years. NC Solar Now installs solar panels, battery backup systems, and EV chargers for homes, businesses, and nonprofits throughout the state. The team includes NABCEP-certified professionals and holds certifications from all major equipment brands.

The company recommends Q Cells panels for their combination of quality, design, and 25-year warranty, and also installs REC panels. Inverter options include Enphase, SolarEdge, and Fronius, with battery storage from Tesla and Enphase. NC Solar Now handles every aspect of the project in-house, from initial consultation and system design through permitting, installation, and utility interconnection. The company also offers Therma Shield radiant barrier products for additional energy efficiency.

NC Solar Now has accumulated over 250 five-star Google reviews and holds a 5.0-star rating on EnergySage with a BBB A+ rating. The company was featured as a Q Cells success story for its strong partnership with the panel manufacturer. NC Solar Now is open Monday through Friday from 9:00 AM to 5:00 PM and offers free consultations for homeowners considering solar.

Service Area

NC Solar Now serves the following areas within a 93-mile radius:

RaleighDurhamCaryChapel HillWake ForestCharlotteGreensboroFayetteville

Are you NC Solar Now?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Solar Design
Monitoring

Certifications & Accreditations

NABCEP Certified Tesla Certified Enphase Certified SolarEdge Certified Q Cells Certified REC Certified BBB A+ Rating

Partner Manufacturers

Panels

Q CellsREC

Inverters

EnphaseSolarEdgeFronius

Batteries

Tesla PowerwallEnphase

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

250 reviews

Brian K.

22 October 2025
Verified Customer

NC Solar Now installed a 9 kW system with battery backup on our Raleigh home. The team was communicative at every step and the installation was completed in a single day. Production has exceeded estimates by about 10%.

Michelle R.

30 June 2025
Verified Customer

Locally owned and it shows in their customer service. They took the time to explain every option and never pushed us toward more expensive equipment. The Q Cells panels look great and are producing well.

Steven T.

15 February 2025
Verified Customer

Had NC Solar Now add a battery to our existing solar system. They integrated it seamlessly and the monitoring app now shows both solar production and battery status. Professional team from start to finish.

Frequently Asked Questions About NC Solar Now

What services does NC Solar Now offer?

NC Solar Now offers Solar Installation, Battery Storage, EV Charging, Solar Design, Monitoring.

Is NC Solar Now NABCEP certified?

NC Solar Now holds the following certifications: NABCEP Certified, Tesla Certified, Enphase Certified, SolarEdge Certified, Q Cells Certified, REC Certified, BBB A+ Rating. Contact them directly for the latest accreditation details.

What areas does NC Solar Now serve?

NC Solar Now serves Raleigh, Durham, Cary, Chapel Hill, Wake Forest, Charlotte, Greensboro, Fayetteville. They are based in Raleigh with a service radius of 150 km.

What warranty does NC Solar Now offer?

NC Solar Now offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are NC Solar Now's customer reviews?

NC Solar Now has a 5/5 rating based on 250 customer reviews. Customers consistently rate them highly.

How long has NC Solar Now been in business?

NC Solar Now was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from NC Solar Now

Fill in your details and we'll connect you with NC Solar Now.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote