A&R Solar
Employee-owned B Corporation serving Portland with 3,700+ solar arrays and offices across the Pacific Northwest
19+
Years in Business
3,700+
Projects Completed
30
Customer Reviews
50 mi
Service Area
51-100
Employees
SurgePV Score
About A&R Solar
A&R Solar operates a Portland office at 6800 NE 59th Pl, part of the company’s Pacific Northwest network that includes offices in Puget Sound, Portland, Bend, and Eastern Washington. Founded in 2007 as an employee-owned venture in Seattle, A&R Solar has installed over 3,700 solar arrays totaling 37 megawatts of clean energy across Washington and Oregon.
The Portland team provides residential and commercial solar installation, battery storage, and EV charging solutions. As a Certified B Corporation and NABCEP-certified installer, A&R Solar meets verified standards for social and environmental performance. The employee-owned structure means every team member has a direct stake in the quality of each installation.
A&R Solar holds an A+ BBB rating and maintains a 4.9-star average on Yelp. The company’s Portland office serves the metro area including Beaverton, Lake Oswego, Tigard, and Hillsboro. Customers consistently rate the company highly for professionalism, transparent pricing, and quality workmanship. For estimates, contact the Portland office at [email protected].
Service Area
A&R Solar serves the following areas within a 50-mile radius:
Contact Information
Are you A&R Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
30 reviews
NE Portland Homeowner
A&R Solar's Portland office provided the same quality and professionalism the company is known for in Seattle. Employee-owned and it shows in the care they take.
Beaverton Customer
Knowledgeable team, transparent pricing, and a smooth installation process. The B Corp certification reflects their genuine commitment to doing things right.
Lake Oswego Resident
Professional from consultation to commissioning. Competitive pricing for the quality of equipment and installation provided.
Frequently Asked Questions About A&R Solar
What services does A&R Solar offer?
A&R Solar offers Solar Installation, Battery Storage, EV Charging.
Is A&R Solar NABCEP certified?
Yes, A&R Solar is NABCEP certified and also holds B Corporation certification. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does A&R Solar serve?
A&R Solar serves Portland, Beaverton, Lake Oswego, Tigard, Hillsboro. They are based in Portland with a service radius of 80 km.
What warranty does A&R Solar offer?
A&R Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are A&R Solar's customer reviews?
A&R Solar has a 4.9/5 rating based on 30 customer reviews. Customers consistently rate them highly.
How long has A&R Solar been in business?
A&R Solar was founded in 2007 and has been in business for 19 years. They are one of the more experienced solar installers in their area.
Similar Installers in Portland
Get a Free Solar Quote from A&R Solar
Fill in your details and we'll connect you with A&R Solar.
Quote request sent!
A&R Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile