AE

Advanced Energy Systems

Eugene-based solar leader with 20+ years installing residential, commercial, and municipal solar systems across Oregon

Eugene, Oregon
5 (12 reviews)
Verified
Residential Commercial Industrial

22+

Years in Business

0

12

Customer Reviews

124 mi

Service Area

11-50

Employees

SurgePV Score

9.8 / 10
Customer Reviews
100%
Certifications
100%
Experience
100%
Services Range
100%
Warranty Coverage
80%
Online Presence
100%

About Advanced Energy Systems

Advanced Energy Systems (AES) is a solar installation company based at 65 Centennial Loop, Suite A, in Eugene, Oregon. Founded in 2004, AES has more than 20 years of expertise installing solar panels and battery storage systems for residential, commercial, and municipal clients across all of Oregon.

The company provides comprehensive solar energy services including site evaluation, energy analysis, custom solar system design, engineering, panel installation, system maintenance, solar tax credit analysis, cash flow modeling, and grant writing for architects and project developers. AES has completed some of the largest solar installations in Oregon for ODOT, universities, corporations, and other institutions.

AES is an Energy Trust of Oregon Trade Ally, EWEB-approved contractor, and Oregon Department of Energy authorized solar contractor. The company also holds approvals from EPUD, SUB, and Lane Electric Cooperative. AES maintains a 5.0-star rating from customer reviews, with clients praising the team’s professionalism, expertise, and system performance.

Service Area

Advanced Energy Systems serves the following areas within a 124-mile radius:

EugeneSpringfieldPortlandSalemCorvallisBend

Are you Advanced Energy Systems?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Grid Connection
Maintenance
Monitoring

Certifications & Accreditations

Energy Trust of Oregon Trade Ally EWEB Approved Contractor Oregon Department of Energy Authorized Oregon Contractor License

Partner Manufacturers

Panels

SolarWorldSunPower

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

12 reviews

William T.

1 November 2025
Verified Customer

The AES team was top drawer all the way. Our system is performing beyond expectations. If you want solar, go with Advanced Energy Systems.

Carol S.

15 September 2025
Verified Customer

AES designed and installed a commercial system for our business. Their expertise with larger installations and grant writing saved us thousands.

Robert M.

28 June 2025
Verified Customer

Professional from start to finish. They handled site evaluation, engineering, permits, and installation. The system is generating more power than projected.

Frequently Asked Questions About Advanced Energy Systems

What services does Advanced Energy Systems offer?

Advanced Energy Systems offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection, Maintenance, Monitoring.

Is Advanced Energy Systems NABCEP certified?

Advanced Energy Systems holds the following certifications: Energy Trust of Oregon Trade Ally, EWEB Approved Contractor, Oregon Department of Energy Authorized, Oregon Contractor License. Contact them directly for the latest accreditation details.

What areas does Advanced Energy Systems serve?

Advanced Energy Systems serves Eugene, Springfield, Portland, Salem, Corvallis, Bend. They are based in Eugene with a service radius of 200 km.

What warranty does Advanced Energy Systems offer?

Advanced Energy Systems offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Advanced Energy Systems's customer reviews?

Advanced Energy Systems has a 5/5 rating based on 12 customer reviews. Customers consistently rate them highly.

How long has Advanced Energy Systems been in business?

Advanced Energy Systems was founded in 2004 and has been in business for 22 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Advanced Energy Systems

Fill in your details and we'll connect you with Advanced Energy Systems.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote