A1A Solar Contracting
NABCEP Company Accredited solar installer serving Northeast Florida since 2010 with A+ BBB rating
16+
Years in Business
40
Customer Reviews
93 mi
Service Area
11-50
Employees
SurgePV Score
About A1A Solar Contracting
A1A Solar Contracting is a Jacksonville-based solar installation company founded in 2010 by Pete Wilking, who entered the solar industry in 2006. The company operates from 10418 New Berlin Road, Suite 223, in Jacksonville and serves Northeast Florida and Southeast Georgia. A1A Solar is one of only eleven NABCEP Company Accredited installers in the country, achieving this designation in December 2022.
The company holds Florida Solar Contractor (CVC 56771), Electrical Contractor (EC 13001175), and General Contractor (CGC 1513100) licenses. A1A is a Tesla Certified Installer and an Enphase Gold Dealer, with a BBB A+ rating maintained since accreditation in 2014. The company installs Tesla and Canadian Solar panels with Enphase and Tesla inverters, paired with Tesla Powerwall and Enphase IQ battery storage systems.
A1A Solar provides full-service solar installations for residential and commercial clients, handling system design, engineering, permitting, installation, utility interconnection, and ongoing monitoring. The company also offers energy storage solutions, HVAC integration, and energy efficiency consulting. With a BuildZoom score in the top 5% of Florida contractors, A1A Solar has established itself as one of the most credentialed solar installers in the Jacksonville market.
Service Area
A1A Solar Contracting serves the following areas within a 93-mile radius:
Contact Information
Are you A1A Solar Contracting?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
40 reviews
Richard P.
A1A Solar handled our installation from start to finish with professionalism. The sales representative was informative and the installation crew was efficient. System has been producing as promised for several months now.
Maria G.
We chose A1A because of their NABCEP Company Accreditation, which only a handful of installers in Florida hold. The quality of the installation reflected that level of certification. Very satisfied.
Thomas B.
Superb installation and customer service. The permitting process took a few weeks but A1A kept us updated throughout. The Enphase monitoring system gives great visibility into daily production.
Frequently Asked Questions About A1A Solar Contracting
What services does A1A Solar Contracting offer?
A1A Solar Contracting offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection, Maintenance, Monitoring.
Is A1A Solar Contracting NABCEP certified?
A1A Solar Contracting holds the following certifications: NABCEP Company Accredited, BBB A+, Tesla Certified Installer, Enphase Gold Dealer, FL Solar Contractor CVC 56771, FL Electrical Contractor EC 13001175, FL General Contractor CGC 1513100. Contact them directly for the latest accreditation details.
What areas does A1A Solar Contracting serve?
A1A Solar Contracting serves Jacksonville, St. Augustine, Jacksonville Beach, Fernandina Beach, Orange Park, Ponte Vedra Beach, Brunswick. They are based in Jacksonville with a service radius of 150 km.
What warranty does A1A Solar Contracting offer?
A1A Solar Contracting offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are A1A Solar Contracting's customer reviews?
A1A Solar Contracting has a 4.5/5 rating based on 40 customer reviews. Customers consistently rate them highly.
How long has A1A Solar Contracting been in business?
A1A Solar Contracting was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.
Similar Installers in Jacksonville
Get a Free Solar Quote from A1A Solar Contracting
Fill in your details and we'll connect you with A1A Solar Contracting.
Quote request sent!
A1A Solar Contracting will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile