Absolar
Commercial solar installation and AI-powered feasibility specialists serving businesses across Bournemouth and the UK
8+
Years in Business
100 km
Service Area
11-50
Employees
SurgePV Score
About Absolar
Absolar is a commercial solar installation company based in Bournemouth, BH1 3BP. Founded in 2018, the company specialises in helping UK businesses — including warehouses, office blocks, retail and hospitality venues — transition to renewable energy through expertly delivered commercial solar installations.
The company uses AI-based assessment technologies to evaluate building solar feasibility across single sites and portfolio-wide assessments. Services include commercial solar design and installation, feasibility studies, performance monitoring, ROI forecasting, and assistance with grant applications. Absolar works across sectors including education, public sector, manufacturing, and hospitality.
Absolar handles every stage of a commercial solar project in-house, from initial site assessment and system design through to installation, commissioning, and ongoing monitoring. The company serves businesses across Bournemouth and the surrounding coastal region, including areas such as Poole, Christchurch, Bournemouth Airport Business Park, and Mallard Road Retail Park.
Service Area
Absolar serves the following areas within a 100 km radius:
Contact Information
Are you Absolar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
No reviews yet.
Frequently Asked Questions About Absolar
What services does Absolar offer?
Absolar offers Solar Installation, Monitoring, Energy Audit.
Is Absolar MCS certified?
Yes, Absolar is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Absolar serve?
Absolar serves Bournemouth, Poole, Southampton, Bristol, London. They are based in Bournemouth with a service radius of 100 km.
What warranty does Absolar offer?
Absolar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Absolar's customer reviews?
Absolar does not have any reviews yet. Be the first to leave a review after using their services.
How long has Absolar been in business?
Absolar was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.
Similar Installers in Bournemouth
Get a Free Solar Quote from Absolar
Fill in your details and we'll connect you with Absolar.
Quote request sent!
Absolar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile