DS

Dorset Solar Solutions

Local MCS certified solar panel installers for Bournemouth and Dorset

Bournemouth, UK
5 (46 reviews)
Verified
Residential Commercial

2026+

Years in Business

0

46

Customer Reviews

40 km

Service Area

1-10

Employees

SurgePV Score

7.7 / 10
Customer Reviews
100%
Certifications
60%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
25%

About Dorset Solar Solutions

Dorset Solar Solutions is a Bournemouth-based solar installation company serving residential and commercial customers across Bournemouth, Poole, Christchurch, Dorchester, and Weymouth. The company provides solar PV installation and battery storage services, handling projects from initial survey through to grid connection and commissioning.

As an MCS certified installer, Dorset Solar Solutions meets the national standards required for installations to qualify for the Smart Export Guarantee, ensuring customers can export surplus electricity back to the grid and receive payment from their energy supplier.

The company focuses on the Dorset and south Hampshire coastal area, offering customers a locally based team with direct knowledge of installation requirements and planning considerations specific to the region. Post-installation maintenance services are available to keep systems running at optimum performance.

Service Area

Dorset Solar Solutions serves the following areas within a 40 km radius:

BournemouthPooleChristchurchDorchesterWeymouth

Are you Dorset Solar Solutions?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

MCS

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Dorset Solar Solutions

What services does Dorset Solar Solutions offer?

Dorset Solar Solutions offers Solar Installation, Battery Storage, Maintenance.

Is Dorset Solar Solutions MCS certified?

Yes, Dorset Solar Solutions is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Dorset Solar Solutions serve?

Dorset Solar Solutions serves Bournemouth, Poole, Christchurch, Dorchester, Weymouth. They are based in Bournemouth with a service radius of 40 km.

What warranty does Dorset Solar Solutions offer?

Dorset Solar Solutions offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Dorset Solar Solutions's customer reviews?

Dorset Solar Solutions has a 5/5 rating based on 46 customer reviews. Customers consistently rate them highly.

How long has Dorset Solar Solutions been in business?

Dorset Solar Solutions was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Dorset Solar Solutions

Fill in your details and we'll connect you with Dorset Solar Solutions.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote