AEC Solar
SunPower Master Dealer and NABCEP certified installer providing solar and energy solutions in Albany since 1991
35+
Years in Business
30
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About AEC Solar
AEC Solar, a division of American Energy Care Inc., is a solar and energy solutions company based at 210 Washington Avenue Extension in Albany, NY. The company was founded in 1991 and expanded its solar division in 2013. AEC Solar is a SunPower Master Dealer and holds NABCEP, SEIA, and NYSERDA certifications.
The company installs premium solar panels from SunPower, Maxeon, and REC, paired with Enphase, SolarEdge, or SMA inverters. Battery storage options include Tesla Powerwall and Generac systems. AEC Solar is designated as a Master Partner and highest-ranking preferred dealer for multiple major solar and storage manufacturers.
AEC Solar provides both residential and commercial solar installations throughout the Capital District. The company operates Monday through Friday from 8:30 AM to 5 PM and offers free solar savings estimates through their website.
Service Area
AEC Solar serves the following areas within a 50-mile radius:
Contact Information
Are you AEC Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.3
30 reviews
William H.
AEC Solar installed SunPower panels on our Albany home and the quality difference is noticeable. As a SunPower Master Dealer, they know these systems inside and out.
Martha S.
Experienced company that has been around for decades. Our solar installation was well done and the system is producing as estimated. Good warranty coverage.
George R.
AEC Solar handled our commercial project professionally. Their NABCEP certification and decades of experience gave us confidence in the installation quality.
Frequently Asked Questions About AEC Solar
What services does AEC Solar offer?
AEC Solar offers Solar Installation, Battery Storage, Solar Design, Monitoring, Maintenance.
Is AEC Solar NABCEP certified?
Yes, AEC Solar is NABCEP certified and also holds SEIA Member, SunPower Master Dealer, NYSERDA Approved certifications. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does AEC Solar serve?
AEC Solar serves Albany, Schenectady, Troy, Saratoga Springs, Clifton Park, Latham. They are based in Albany with a service radius of 80 km.
What warranty does AEC Solar offer?
AEC Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are AEC Solar's customer reviews?
AEC Solar has a 4.3/5 rating based on 30 customer reviews. They are well-regarded by their customers.
How long has AEC Solar been in business?
AEC Solar was founded in 1991 and has been in business for 35 years. They are one of the more experienced solar installers in their area.
Similar Installers in Albany
Get a Free Solar Quote from AEC Solar
Fill in your details and we'll connect you with AEC Solar.
Quote request sent!
AEC Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile