AS

AEV Solar

Little Rock solar installer and certified Tesla Powerwall crew specializing in residential and commercial solar

Little Rock, Arkansas
5 (36 reviews)
Verified
Residential Commercial

9+

Years in Business

0

36

Customer Reviews

50 mi

Service Area

1-10

Employees

SurgePV Score

8.9 / 10
Customer Reviews
100%
Certifications
90%
Experience
85%
Services Range
75%
Warranty Coverage
80%
Online Presence
100%

About AEV Solar

AEV Solar (Arkansas Energy Ventures) is a solar installation company located at 2304 Cantrell Rd, Little Rock, AR 72202. Founded in 2017, AEV Solar is the only licensed Tesla Powerwall installation crew in the Little Rock area, providing residential and commercial solar, energy consulting, off-grid systems, EV charging, solar carports, and ground-mounted solar installations.

The company is led by a team of three: Jaimin Vashi (electrical engineer), John Ekdahl (sales and construction), and Kevin Mach (software). AEV Solar holds an Arkansas Residential Unlimited Contractor License and Solar Contractors License (Class 3), and specializes in smart inverters and monitoring tools for energy management.

Service Area

AEV Solar serves the following areas within a 50-mile radius:

Little RockNorth Little RockConwayBentonBryantCabot

Are you AEV Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Certifications & Accreditations

Certified Tesla Powerwall Installer Arkansas Residential Unlimited Contractor License (0373130220) Arkansas Solar Contractors License (Class 3)

Partner Manufacturers

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

No reviews yet.

Frequently Asked Questions About AEV Solar

What services does AEV Solar offer?

AEV Solar offers Solar Installation, Battery Storage, EV Charging.

Is AEV Solar NABCEP certified?

AEV Solar holds the following certifications: Certified Tesla Powerwall Installer, Arkansas Residential Unlimited Contractor License (0373130220), Arkansas Solar Contractors License (Class 3). Contact them directly for the latest accreditation details.

What areas does AEV Solar serve?

AEV Solar serves Little Rock, North Little Rock, Conway, Benton, Bryant, Cabot. They are based in Little Rock with a service radius of 80 km.

What warranty does AEV Solar offer?

AEV Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are AEV Solar's customer reviews?

AEV Solar has a 5/5 rating based on 36 customer reviews. Customers consistently rate them highly.

How long has AEV Solar been in business?

AEV Solar was founded in 2017 and has been in business for 9 years. They have solid experience in the solar industry.

Get a Free Solar Quote from AEV Solar

Fill in your details and we'll connect you with AEV Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote