SS

Seal Solar

Arkansas solar pioneer with 600+ installations and certified Tesla Powerwall dealer since 2012

Little Rock, Arkansas
4.7 (109 reviews)
Verified
Residential Commercial

14+

Years in Business

600+

Projects Completed

109

Customer Reviews

62 mi

Service Area

11-50

Employees

SurgePV Score

8.5 / 10
Customer Reviews
94%
Certifications
75%
Experience
85%
Services Range
60%
Warranty Coverage
100%
Online Presence
100%

About Seal Solar

Seal Solar is an Arkansas-based solar company headquartered at 700 W Broadway St, Suite 100, North Little Rock, AR 72114. Founded in 2012, Seal Solar has completed over 600 solar installations — approximately one in five solar projects in Arkansas — including more than 215 in the greater Little Rock area and over 175 Tesla Powerwall installations statewide.

Seal Solar installs SolarEdge inverters, Silfab panels, and Tesla Powerwall battery storage systems. The company is BBB accredited and offers a 25-year workmanship warranty on all installations. Seal Solar provides solar design, installation, and energy storage solutions for residential and commercial clients throughout central Arkansas.

Service Area

Seal Solar serves the following areas within a 62-mile radius:

Little RockNorth Little RockConwayHot SpringsBentonPine Bluff

Are you Seal Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage

Certifications & Accreditations

Certified Tesla Powerwall Installer BBB Accredited

Partner Manufacturers

Panels

Silfab

Inverters

SolarEdge

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

25 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

No reviews yet.

Frequently Asked Questions About Seal Solar

What services does Seal Solar offer?

Seal Solar offers Solar Installation, Battery Storage.

Is Seal Solar NABCEP certified?

Seal Solar holds the following certifications: Certified Tesla Powerwall Installer, BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Seal Solar serve?

Seal Solar serves Little Rock, North Little Rock, Conway, Hot Springs, Benton, Pine Bluff. They are based in Little Rock with a service radius of 100 km.

What warranty does Seal Solar offer?

Seal Solar offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.

How are Seal Solar's customer reviews?

Seal Solar has a 4.7/5 rating based on 109 customer reviews. Customers consistently rate them highly.

How long has Seal Solar been in business?

Seal Solar was founded in 2012 and has been in business for 14 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Seal Solar

Fill in your details and we'll connect you with Seal Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote