AS

AK Systems

MCS and FGAS certified solar PV and air conditioning installers in Gloucestershire and the South West

Gloucester, UK
0 (0 reviews)
Verified
Residential Commercial

2026+

Years in Business

0

50 km

Service Area

2-10

Employees

SurgePV Score

6 / 10
Customer Reviews
0%
Certifications
75%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
75%

About AK Systems

AK Systems Ltd is an MCS and FGAS certified installer providing solar PV and air conditioning systems across Gloucestershire and the South West. The company is registered at 17 Boughton Way, Gloucester GL4 4PG and can be contacted by email at [email protected]. Company registration number is 14093160.

The company specialises in domestic solar photovoltaic installations and battery storage solutions for residential customers across Gloucester, Cheltenham, Bristol, and Swindon. As an MCS certified installer, AK Systems is authorised to issue the MCS certificates customers need to access the Smart Export Guarantee and sell surplus energy back to the grid.

AK Systems combines solar PV installation experience with FGAS certification for air conditioning work, offering customers a single contractor for both solar and cooling installations. The team provides professional system design, installation, and aftercare support throughout Gloucestershire and the South West region.

Service Area

AK Systems serves the following areas within a 50 km radius:

GloucesterCheltenhamBristolSwindon

Are you AK Systems?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

MCS FGAS

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About AK Systems

What services does AK Systems offer?

AK Systems offers Solar Installation, Battery Storage, Maintenance.

Is AK Systems MCS certified?

Yes, AK Systems is MCS certified and also holds FGAS certification. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does AK Systems serve?

AK Systems serves Gloucester, Cheltenham, Bristol, Swindon. They are based in Gloucester with a service radius of 50 km.

What warranty does AK Systems offer?

AK Systems offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are AK Systems's customer reviews?

AK Systems does not have any reviews yet. Be the first to leave a review after using their services.

How long has AK Systems been in business?

AK Systems was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from AK Systems

Fill in your details and we'll connect you with AK Systems.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote