PE

Potentia Engineering

Values-based solar, battery storage, and EV charger specialists serving Cheltenham, Gloucester, and the South West

Gloucester, UK
4.9 (15 reviews)
Verified
Residential Commercial

2026+

Years in Business

0

15

Customer Reviews

80 km

Service Area

2-10

Employees

SurgePV Score

7.7 / 10
Customer Reviews
98%
Certifications
60%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
25%

About Potentia Engineering

Potentia Engineering Ltd is a solar and renewable energy company based in Cheltenham that operates across Cheltenham, Gloucester, Bristol, Guildford, and the South West. The company describes itself as a fully accredited, values-based organisation with a mission to reduce clients’ energy costs by shielding them from rising energy prices through solar and battery technology.

Services include professional solar panel installations, standalone battery storage systems, and EV charging points for domestic and commercial premises. Potentia Engineering delivers full-scope projects from design through to commissioning, and the administrative team is noted by customers for prompt delivery of paperwork, certifications, and documentation after installation.

Customer reviews on Checkatrade and other platforms are consistently positive. Reviewers describe the installation team as punctual, tidy, knowledgeable, and friendly, and the company’s aftercare support is frequently highlighted. One customer reported saving £700 on energy bills plus £100 in export payments within five months of installation. Potentia Engineering is listed and reviewed on Checkatrade and can be contacted via their website at potentia-engineering.co.uk.

Service Area

Potentia Engineering serves the following areas within a 80 km radius:

CheltenhamGloucesterBristolGuildford

Are you Potentia Engineering?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Certifications & Accreditations

MCS

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4.9

15 reviews

Verified Customer

1 October 2024
Verified Customer

Punctual, tidy, knowledgeable, and incredibly friendly. They genuinely enjoy their work and the results speak for themselves.

Verified Customer

15 July 2024
Verified Customer

Saving £700 on bills plus £100 in export payments in the five months since installation. Could not be happier.

Frequently Asked Questions About Potentia Engineering

What services does Potentia Engineering offer?

Potentia Engineering offers Solar Installation, Battery Storage, EV Charging.

Is Potentia Engineering MCS certified?

Yes, Potentia Engineering is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Potentia Engineering serve?

Potentia Engineering serves Cheltenham, Gloucester, Bristol, Guildford. They are based in Gloucester with a service radius of 80 km.

What warranty does Potentia Engineering offer?

Potentia Engineering offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Potentia Engineering's customer reviews?

Potentia Engineering has a 4.9/5 rating based on 15 customer reviews. Customers consistently rate them highly.

How long has Potentia Engineering been in business?

Potentia Engineering was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Potentia Engineering

Fill in your details and we'll connect you with Potentia Engineering.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote