AS

Albany Solar Solutions

Family-owned solar contractor specializing in custom solar panel systems for homes across Upstate New York since 2015

Albany, New York
4.2 (20 reviews)
Residential

11+

Years in Business

0

20

Customer Reviews

50 mi

Service Area

1-10

Employees

SurgePV Score

6.6 / 10
Customer Reviews
84%
Certifications
0%
Experience
85%
Services Range
75%
Warranty Coverage
63%
Online Presence
100%

About Albany Solar Solutions

Albany Solar Solutions is a family-owned solar installation company based at 15 Farrell Road in Troy, NY, serving Albany, Troy, Schenectady, Saratoga Springs, and communities throughout Upstate New York. Founded in 2015, the company specializes in custom solar panel systems designed for maximum efficiency and long-term savings.

The company offers honest, fair pricing with free quotes for residential solar installations. Albany Solar Solutions handles the full project from initial site assessment and system design through permitting, installation, and utility interconnection. The company also installs battery storage systems for backup power and increased energy self-consumption.

Albany Solar Solutions assists customers with New York State solar incentives, NYSERDA programs, and net metering setup with their local utility provider.

Service Area

Albany Solar Solutions serves the following areas within a 50-mile radius:

AlbanyTroySchenectadySaratoga SpringsClifton ParkLatham

Are you Albany Solar Solutions?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.2

20 reviews

Janet L.

15 August 2025
Verified Customer

Albany Solar Solutions installed our system and the process was seamless. As a family-owned business, they provided honest, fair pricing and personal attention throughout.

Rob K.

10 May 2025
Verified Customer

Kim and the team were responsive and professional. The installation was fast and our system started producing power right away. Good local company.

Heather M.

22 February 2025
Verified Customer

Competitive pricing and a straightforward process. The crew was professional and the installation was completed as scheduled. Our energy bills have dropped noticeably.

Frequently Asked Questions About Albany Solar Solutions

What services does Albany Solar Solutions offer?

Albany Solar Solutions offers Solar Installation, Battery Storage, Solar Design.

Is Albany Solar Solutions NABCEP certified?

Albany Solar Solutions holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Albany Solar Solutions serve?

Albany Solar Solutions serves Albany, Troy, Schenectady, Saratoga Springs, Clifton Park, Latham. They are based in Albany with a service radius of 80 km.

What warranty does Albany Solar Solutions offer?

Albany Solar Solutions offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Albany Solar Solutions's customer reviews?

Albany Solar Solutions has a 4.2/5 rating based on 20 customer reviews. They are well-regarded by their customers.

How long has Albany Solar Solutions been in business?

Albany Solar Solutions was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Albany Solar Solutions

Fill in your details and we'll connect you with Albany Solar Solutions.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote