AE

Alder Energy Systems

Charleston-based solar developer serving residential, commercial, and government clients across the Southeast since 2008

Charleston, South Carolina
4.5 (30 reviews)
Verified
Residential Commercial

18+

Years in Business

0

30

Customer Reviews

75 mi

Service Area

11-50

Employees

SurgePV Score

8.9 / 10
Customer Reviews
90%
Certifications
75%
Experience
100%
Services Range
100%
Warranty Coverage
63%
Online Presence
100%

About Alder Energy Systems

Alder Energy Systems is a solar developer and EPC contractor headquartered at 495 Jessen Lane in Charleston. Founded in 2008, the company has built a portfolio spanning residential, commercial, and government solar installations across the Southeast. Alder Energy was included in the Inc. 5000 list in 2017 and ranked on Solar Power World’s list of the 500 best solar contractors in the United States, reflecting steady growth over its operating history.

The company installs panels from REC and Hanwha Q Cells, paired with SolarEdge and Enphase inverters. Battery storage options include the Tesla Powerwall. Alder Energy holds NABCEP certification and offers services covering the full project lifecycle, from site assessment and system design through permitting, installation, monitoring, and ongoing maintenance. The company also develops community solar projects, expanding access to solar beyond individual rooftop installations.

Alder Energy Systems holds a 4.5-star rating across review platforms and is BBB accredited. The company operates Monday through Friday, 9:00 am to 5:00 pm, with a dedicated support team available at [email protected] for existing customers. Reviewers highlight the company’s deep expertise in incentive programs, professional project management, and experience with complex commercial and institutional installations.

Service Area

Alder Energy Systems serves the following areas within a 75-mile radius:

CharlestonMount PleasantNorth CharlestonSummervilleGoose CreekMoncks Corner

Are you Alder Energy Systems?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Grid Connection
Maintenance
Monitoring

Certifications & Accreditations

BBB Accredited NABCEP Certified

Partner Manufacturers

Panels

RECHanwha Q Cells

Inverters

SolarEdgeEnphase

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

30 reviews

Michael R.

8 November 2025
Verified Customer

Alder Energy handled our commercial installation professionally from start to finish. The team was knowledgeable about incentive programs and designed a system that maximized our savings.

Patricia W.

20 August 2025
Verified Customer

Good experience with our residential installation. Alder has been around for over 15 years which gave us confidence. The system is performing as promised.

Steve G.

5 May 2025
Verified Customer

We chose Alder for their experience with government projects. Their team understood the procurement process and delivered a quality installation on schedule.

Frequently Asked Questions About Alder Energy Systems

What services does Alder Energy Systems offer?

Alder Energy Systems offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection, Maintenance, Monitoring.

Is Alder Energy Systems NABCEP certified?

Alder Energy Systems holds the following certifications: BBB Accredited, NABCEP Certified. Contact them directly for the latest accreditation details.

What areas does Alder Energy Systems serve?

Alder Energy Systems serves Charleston, Mount Pleasant, North Charleston, Summerville, Goose Creek, Moncks Corner. They are based in Charleston with a service radius of 120 km.

What warranty does Alder Energy Systems offer?

Alder Energy Systems offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Alder Energy Systems's customer reviews?

Alder Energy Systems has a 4.5/5 rating based on 30 customer reviews. Customers consistently rate them highly.

How long has Alder Energy Systems been in business?

Alder Energy Systems was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Alder Energy Systems

Fill in your details and we'll connect you with Alder Energy Systems.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote