SS

Second Sunrise Solar

Charleston's highest-rated local solar company with a 4.9-star rating and offices in Mount Pleasant

Charleston, South Carolina
4.9 (30 reviews)
Residential Commercial

7+

Years in Business

0

30

Customer Reviews

50 mi

Service Area

2-10

Employees

SurgePV Score

6.8 / 10
Customer Reviews
98%
Certifications
0%
Experience
70%
Services Range
90%
Warranty Coverage
63%
Online Presence
100%

About Second Sunrise Solar

Second Sunrise Solar is a solar installation company with offices at 537 Long Point Road, Suite 203, in Mount Pleasant, and 720 Magnolia Road, Suite 8C, in Charleston. The company serves residential and commercial customers across the greater Charleston area and holds the distinction of being the highest-rated local solar company in Charleston on the EnergySage Marketplace, with a 4.9-star rating.

The company installs panels from REC and Hanwha Q Cells, paired with Enphase microinverters. Battery storage options include the Tesla Powerwall. Second Sunrise Solar provides full-service solar installations from initial consultation and energy audit through system design, permitting, installation, and utility interconnection. The company operates Monday through Friday, 8:00 am to 7:00 pm, with Saturday hours from 9:00 am to 3:00 pm, offering more availability than most competitors.

Second Sunrise Solar holds a 4.9-star rating across review platforms. Customers consistently highlight the transparent pricing, professional installations, and detailed system design process. The company’s dual-office presence in both Mount Pleasant and Charleston proper makes them accessible to homeowners across the Lowcountry.

Service Area

Second Sunrise Solar serves the following areas within a 50-mile radius:

CharlestonMount PleasantNorth CharlestonSummervilleJames IslandWest AshleyDaniel Island

Are you Second Sunrise Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Grid Connection

Partner Manufacturers

Panels

RECHanwha Q Cells

Inverters

Enphase

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.9

30 reviews

Rebecca S.

30 October 2025
Verified Customer

Second Sunrise Solar made going solar easy. They explained everything clearly, the pricing was transparent, and the installation was done in a day. System is performing above expectations.

Matt W.

8 August 2025
Verified Customer

Highest rated solar company in Charleston for a reason. Professional from start to finish. They designed a system that perfectly matches our energy usage.

Julie A.

19 May 2025
Verified Customer

We got quotes from five companies and Second Sunrise stood out for their honesty and attention to detail. The crew was respectful of our property and the system looks great on our roof.

Frequently Asked Questions About Second Sunrise Solar

What services does Second Sunrise Solar offer?

Second Sunrise Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection.

Is Second Sunrise Solar NABCEP certified?

Second Sunrise Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Second Sunrise Solar serve?

Second Sunrise Solar serves Charleston, Mount Pleasant, North Charleston, Summerville, James Island, West Ashley, Daniel Island. They are based in Charleston with a service radius of 80 km.

What warranty does Second Sunrise Solar offer?

Second Sunrise Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Second Sunrise Solar's customer reviews?

Second Sunrise Solar has a 4.9/5 rating based on 30 customer reviews. Customers consistently rate them highly.

How long has Second Sunrise Solar been in business?

Second Sunrise Solar was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Second Sunrise Solar

Fill in your details and we'll connect you with Second Sunrise Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote