All Energy Solar
Minnesota's largest local solar installer with 11,500+ projects and 2,200 five-star reviews
17+
Years in Business
11,500+
Projects Completed
2,200
Customer Reviews
93 mi
Service Area
201-500
Employees
SurgePV Score
About All Energy Solar
All Energy Solar is one of Minnesota’s largest locally owned solar installation companies, founded in 2009 by brothers Michael and Brian Allen. Headquartered at 721 W 26th Street in Minneapolis with additional offices in Saint Paul, the company has completed over 11,500 residential, commercial, agricultural, and government solar projects across the Upper Midwest.
The company provides full-service solar installation including system design, engineering, permitting, installation, battery storage, EV charging, and ongoing monitoring and maintenance. All Energy Solar employs NABCEP-certified installers and installs panels from REC, Silfab, and Canadian Solar alongside Enphase and SolarEdge inverters and Tesla Powerwall and Enphase battery systems. The company holds an A+ rating from the Better Business Bureau.
With over 2,200 five-star reviews and a 4.8-star average rating, All Energy Solar is among the most-reviewed solar installers in Minnesota. The company has grown to nearly 300 employees and serves customers across Minnesota, Wisconsin, Iowa, and beyond. All Energy Solar offers a 25-year panel warranty, 25-year inverter warranty, and 10-year workmanship guarantee on all installations.
Service Area
All Energy Solar serves the following areas within a 93-mile radius:
Contact Information
Are you All Energy Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
2200 reviews
Scott H.
All Energy Solar handled our residential installation flawlessly. From the initial consultation to the final inspection, every step was well-organized. Our system has been producing above estimates for five months straight.
Karen L.
We compared three local companies and All Energy Solar offered the best combination of price, equipment quality, and customer service. The installation crew was respectful and efficient. Very happy with our decision.
Ryan P.
Great system and good overall experience. The permitting process took a few weeks longer than expected due to city delays, but All Energy kept us informed throughout. System performance has been excellent.
Frequently Asked Questions About All Energy Solar
What services does All Energy Solar offer?
All Energy Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Monitoring, Maintenance, Commercial Solar, EV Charging.
Is All Energy Solar NABCEP certified?
Yes, All Energy Solar is NABCEP certified and also holds BBB A+ Accredited certification. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does All Energy Solar serve?
All Energy Solar serves Minneapolis, Saint Paul, Bloomington, Plymouth, Edina, Minnetonka, Eden Prairie, Maple Grove. They are based in Minneapolis with a service radius of 150 km.
What warranty does All Energy Solar offer?
All Energy Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are All Energy Solar's customer reviews?
All Energy Solar has a 4.8/5 rating based on 2200 customer reviews. Customers consistently rate them highly.
How long has All Energy Solar been in business?
All Energy Solar was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in Minneapolis
Get a Free Solar Quote from All Energy Solar
Fill in your details and we'll connect you with All Energy Solar.
Quote request sent!
All Energy Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile